At a glance
The Hudson Planning Board held a special meeting to advance the Bliss Towers redevelopment site plan review. The board heard from its engineer that every engineering item except the stormwater plan has been addressed, reviewed responses to over 300 public comments organized into topic categories, and examined building materials samples showing brick, fiber cement panels, and color selections. The chair asked for a consolidated final site plan package before deliberation; members were divided and he set aside a motion, and at the end of the meeting the applicant offered to gather its existing plans in one package. No vote was taken; the board will hold one more meeting with the design architect before concluding the review.
Roll Call and Meeting Structure
Chairman Ron Bogle outlined the special meeting agenda: an engineering update, follow-up on public hearing comments, and a materials presentation. He announced the board would not vote tonight and explained the remaining steps before a decision.
Key points
- Board clerk Linda Fenoff joined remotely; quorum was present with all members attending.
- Bogle explained the meeting would cover engineering status, responses to public comments organized into topic buckets, and building materials.
- The board has not finished the review process; two major steps remain: confirming the record is complete and defensible, then board deliberation.
- A vote will not happen tonight; the board must conclude the record is complete before deliberating and reaching consensus.
- Bogle proposed a round-robin format for board questions, with each member holding the floor without interruption to establish a clear record.
Engineering Update and Draft Conditions
Engineer Rich provided an update on technical review, confirming most engineering issues have been resolved and presenting draft approval conditions.
Key points
- A new submission was received; a technical review comment letter will be issued before the October regular meeting.
- Only one outstanding item remains: the stormwater pollution prevention plan revision, not yet submitted.
- Rich presented draft conditions for the project, items that would need to be satisfied before the chairperson could sign a final plan if the board approves.
- Draft conditions include obtaining DEC permits, DPW approvals, and submitting a vibration monitoring and mitigation plan.
- These conditions are typical for projects this size and would not require completion before the vote, but before final site plan approval and building permits.
The board discussed a construction management plan beyond the construction logistics drawing already submitted. Rich indicated this would be finalized after approval, once a contractor is selected.
Detailed Engineering Review Questions
Chairman Bogle asked a series of engineering questions to establish a clear record of what has been resolved.
Key points
- Brownfield remediation: Rich confirmed sufficient information exists on the relationship between remediation work and ground improvement.
- Stone column system: The diameter is 1.5 feet, columns will be 20 to 25 feet deep, and Rich now has detailed design information.
- Stormwater: Still waiting on the revised stormwater pollution prevention plan.
- Vibration: HHA reports average vibration below 0.5 inches per second, well under the 2 inches per second residential damage threshold.
- Parking and emergency access: The new fire truck maneuvering plan shows three or four parking spaces in the street that cannot be located where a fire truck needs to turn; these will be removed and marked as a fire lane.
- Rich stated no unresolved engineering issues would materially change the site plan as presented.
Brownfield Status Update
Carl Talo, the environmental engineer, updated the board on the DEC brownfield review process and timeline.
Key points
- The investigational report was submitted; DEC has a draft comment letter in internal review, expected within a week.
- The remedial action work plan was submitted September 18, slightly out of order, to accelerate the DEC review.
- Projected schedule: remedial investigation report approval around November 1, a 45-day public comment period from November 15 to January 1, and decision documents (approval of the remedial action plan) around January 15.
- The schedule matches what was presented in the September 23 response document.
Board Questions on Public Hearing Responses
Chairman Bogle transitioned to board questions on the applicant's responses to public comments, using a round-robin format.
Key points
- Over 300 public responses were received during the public hearing process, organized into topic buckets.
- The applicant produced 161 pages in the first response and 64 pages in the second, totaling over 200 pages of material.
- Jeff reminded the board the application was first submitted February 2025, with lead agency declaration in February 2026, SEQR determination May 28, 2026, three public hearings in July, August, and September, and ZBA approval of variances September 9.
- The project before the board is phase one only; SEQR covered both phases, but this site plan approval is for phase one.
- Jeff stated the project has not substantively changed since day one: density, height, and building dimensions remain the same.
Board Member Questions, Trees and Sustainability
Board members asked about street trees, sustainability guidelines, solar panels, and utilities.
Key points
- A board member asked whether street trees could be selected from the Conservation Advisory Council's approved list; Brian agreed to do so.
- The member asked about planting replacement trees along the Sky Court property line; Brian explained retaining walls and grade make this impractical, but could explore if the neighboring property grants permission.
- The project will follow 2025 HCR sustainability guidelines and 2026 design guidelines, though HCR could change requirements before approval.
- A third-party certifier will be used to verify sustainability standards; the team is working with a sustainability consultant.
- Solar panels are proposed for the main building roof; A and B buildings (townhouses) are being evaluated for solar feasibility depending on orientation and shading.
- Current Bliss residents do not pay separate utilities; in the new building, utilities will be individually metered with a utility allowance provided by the state to keep residents' total costs the same.
Demolition Risk and Performance Bond
The board discussed how to ensure phase two demolition happens, exploring a performance bond or occupancy conditions.
Key points
- A board member raised the risk that phase two might not happen, leaving the old towers standing indefinitely.
- The board engineer proposed a performance bond for demolition and project completion as a draft condition.
- The board member suggested conditioning occupancy of new units on completing demolition, to create a financial incentive.
- Jeff stated conditioning occupancy on phase two would make phase one unfinanceable; lenders would not fund a project with uncertain unit counts.
- Jeff explained phase two includes both demolition and new construction; the team has approached the state and HUD about demolition-specific funding, which some years is available and some years is not.
- There is no guarantee phase two will happen or that financing will be available, but the state is aware and will work to support demolition.
- The board asked for creative problem-solving on this risk; the applicant agreed to review the bond proposal.
The applicant confirmed there is no guarantee phase two will happen. Demolition of the existing Bliss and Columbia towers depends on securing state or federal funding specifically for demolition, or on financing the demolition as part of a larger phase two construction project.
Cost Overruns and Contingency
A board member asked how the project would handle cost overruns during construction.
Key points
- The state builds a 5 percent contingency into new construction budgets (10 percent for rehab).
- Mountco's contract with HHA is a fixed-price contract, so the contractor must deliver unless an extraordinary event occurs outside the contract terms.
- Between now and the construction loan closing, if prices increase for materials or labor, the applicant can document it and request additional subsidy from the state.
- After closing, cost increases would be covered by the contingency budget.
- Jeff explained the state reviews all costs against other 4 percent tax credit projects statewide, so they have an incentive to keep costs reasonable and comparable.
Comparable Projects and Political Risk
The board asked about comparative studies of similar projects and the impact of the November election on state approvals.
Key points
- Jeff explained the team compares costs internally; an 80-unit project in Kingston was approved by the state in June, with similar four-story frame construction and funding.
- The state reviews all costs for 4 percent tax credit projects against every other funded project in the state, providing a benchmark.
- A board member asked whether a new administration after the November election could affect the project; Jeff said affordable housing need is well-documented statewide, and the state has an incentive to use federal tax credit allocations regardless of administration.
- The governor and housing commissioner are aware of this project and want to see it completed.
Building Design and Energy Efficiency
A board member asked about window design and climate resilience.
Key points
- The board member asked how the buildings would handle unusually warm or cold winters.
- Architect Darl explained the windows are energy-efficient, designed for both extreme cold and warm temperatures, with vinyl frames rather than aluminum to reduce heat transfer.
- The windows meet current energy codes and sustainability requirements; the team has used them on many projects.
Lobby Configuration Debate
Board member Peter questioned the shift from multiple small lobbies to larger institutional lobbies, citing conflicting narrative descriptions.
Key points
- Peter referenced a May 14 narrative describing entrances organized to serve smaller residential groupings, avoiding the feel of a large institutional lobby.
- He asked why that language appeared if the plans always showed two primary lobbies; the applicant said the elevations have not changed.
- Jeff acknowledged inconsistency in the text but stated the plans and elevations have been consistent since May.
- Peter argued the written description presented a different building and the team responded at the last meeting with a security rationale for changing, which he took as acknowledgment of a change.
- The applicant's attorney said the comprehensive plan language was mistakenly carried into the narrative and should have been corrected, but the design itself never changed.
- Architect Darl explained he was not involved in the May submission and later confirmed with design architect Alex Gorland that the design never changed; the alternate language was from an earlier scheme considered but not pursued.
- Jeff offered to have Alex Gorland attend the next meeting to explain the design intent in detail.
Peter identified language in the May 14 response describing entrances serving smaller residential groupings and avoiding large institutional lobbies. The applicant said this was an error in the narrative, not a change in design, and that the plans have always shown two primary lobbies per building.
Right to Return and Housing Preferences
Peter asked whether former residents would have a right to return to the new building.
Key points
- Peter said two speakers at the public hearings implied people who left Hudson or Bliss Towers could come back if the project is approved.
- Jeff explained right-to-return typically applies when tenants are moved out, then given a right to return after construction; this project avoids that by building first, so current residents move directly into new units.
- The remaining units will be filled by lottery; the Housing Authority board will decide on preferences (Hudson residents, people who work in Hudson, former Bliss or Columbia residents, police or fire department employees).
- The board's requested preferences must be approved by the state (HCR), which will evaluate them for non-discriminatory intent.
- Jeff said right-to-return does not apply here because no one is being moved out.
Fire Access and Security
Board members asked about fire department coordination and construction site security.
Key points
- Eugene asked whether there is documentation of meetings with fire and police chiefs; he was told a letter from fire representatives is in the record.
- Eugene asked about security during construction; Jeff explained the site will be fenced to protect people and materials, with security assessments based on site conditions.
- After construction, the housing authority will manage security; HHA already has a security director.
Vibration Monitoring in Detail
Board member Veronica asked for a detailed explanation of the vibration monitoring and mitigation plan.
Key points
- Veronica said she did not understand what vibration levels mean or whether nearby homes would be protected.
- Brian explained construction always creates vibrations; the standard for not causing damage to masonry buildings is below 0.5 inches per second.
- The team will conduct a pre-construction assessment of every building in the surrounding area, photographing existing cracks and conditions.
- If a crack is found, a crack monitor may be installed to measure any movement in millimeters during construction.
- Homeowners who have concerns can request monitoring; the inspector will ask permission to enter and document conditions.
- Vibration monitors will be placed throughout the site to record actual vibration levels; analysts can distinguish construction equipment vibrations from external sources like trucks.
- If a crack widens or damage occurs, repairs would be made; the closest buildings are across the street or 70 feet away, far enough that damage is unlikely.
- The inspection radius focuses on adjacent buildings first, then expands only if necessary; buildings 500 feet away would not be at risk.
- Jeff added that the team recently started a project in Kingston near a Head Start program, coordinating demolition schedules with the facility to avoid disruption during outdoor recess.
Building Placement and Retaining Walls
Veronica asked where Building B extends in relation to the property line and the steep drop-off.
Key points
- Veronica referenced walking the site and seeing the lot narrow and drop off quickly near the guard rail.
- Brian explained the site drops about 15 feet from Second Street to the end of the property; to create enough land for parking and buildings, retaining walls were necessary.
- The walls are designed to stay under 20 feet in height to control costs; the building extends close to the property line to maximize usable land.
- The current playground is on a slope; the new design will elevate and level the area, with a fence protecting the retaining wall edge.
- Ground improvement will be required to support the weight of the new soil and retaining walls.
Human Scale and Pedestrian Experience
Chairman Bogle asked how the design creates human scale, neighborhood character, and pedestrian activity along State Street.
Key points
- Bogle asked where residents of Building B on State Street would go when they exit: most will use the parking lot entrance, not the State Street door, so what makes the State Street facade interesting or walkable?
- He questioned whether the design intentionally creates spaces where people will want to meet, walk, or hang out, and whether those objectives depend on phase two happening.
- Jeff responded that phase one includes a temporary playground and landscaping to address those concerns; the overall park will come with phase two.
- Bogle asked whether there had been consideration of greater setback on State Street to create deeper outdoor space; Jeff said he thought an extra 20 feet was gained but would need Alex Gorland to confirm.
- Bogle asked about the early concept of retail or nonprofit space on the ground floor; Jeff explained a rolling grocer was interested but fell through, and the space was converted to additional units rather than risk leaving it vacant.
- Bogle asked whether the planning board could do anything to enable retail space; Jeff said phase two would be a better time to consider it, as changing unit counts at this stage would require restarting state approvals.
Early concepts included retail or nonprofit space on the ground floor, with a rolling grocer as a potential tenant. That fell through, and the space was converted to additional residential units. The applicant indicated phase two would be a better opportunity to revisit retail.
Request for Final Site Plan Package
Chairman Bogle requested a consolidated final site plan package documenting the project the board is being asked to approve.
Key points
- Bogle asked the applicant to assemble a final organized application package with an index of current plans and drawings, plus a detailed narrative describing architectural and site design features.
- He requested the narrative identify building massing, facades, entrances, ground floor treatments, materials, colors, the relationship to the street, landscaping, rooftop screening, and other design features.
- For Building B, the narrative should identify physical features intended to create smaller-scale architectural character and pedestrian experience.
- Where the applicant relies on concepts like human scale or neighborhood character, the narrative should identify specific design features accomplishing those objectives.
- The exterior materials presented tonight should be documented, showing where principal materials will be used on the buildings.
- Jeff objected, saying the latest site plans submitted last week already contain all requested details, and adding a narrative risks opening both sides to challenges or nitpicking.
- He agreed to focus and consolidate the application into one package showing what is being reviewed, but cautioned against elaborate philosophical discussions.
- Bogle opened the request to board discussion; some members felt the applicant had exhaustively answered questions, while others supported consolidation to dot the i's and cross the t's for a clear final record.
- The board debated whether the request was necessary or would only delay deliberation; no formal motion was made.
- Rich clarified the legal team will review the final site plans to ensure everything the applicant said they would do is documented in the plans themselves.
The board discussed whether to require a consolidated final site plan package. Some members felt the applicant had already provided sufficient documentation; others supported consolidation for a clear final record. No motion was made; the board engineer said the legal team will review final plans to confirm all commitments are documented.
Building Materials Presentation
The applicant presented building material samples showing brick, fiber cement panels, and color selections.
Key points
- Two types of brick will be used: a darker reddish brick and a grayer tan brick, with samples of two possible selections for each.
- The red brick will be used around the ground level where people can touch; it is a durable material for grade.
- A stone band made of concrete will separate the brick, with two possible colors being explored.
- Above grade level, fiber cement panels will be used, which are hardy and durable; the main facade will have red fiber cement above the red brick.
- A greenish fiber cement color (Equitone) will be used on bay windows to make them stand out.
- Where the building sets back, a lighter Equitone fiber cement color will be used, with two color options.
- Fiber cement comes in large continuous sheets; there will be flush vertical seams designed to blend in rather than be expressed.
- Mortar for the brick will be in a gray family, coordinated with the lighter color palette to tie the materials together.
- The roof will be flat and not visible from the street, with tapered wood trusses for drainage and a roof membrane; solar panels may be added on top.
- The materials shown are the actual materials currently specified, though final colors will be selected during mockup.
Facade Articulation and Inspiration
Board members asked about the facade articulation and design inspiration.
Key points
- A board member asked how the pumped-out bay segments are defined; Brian explained the inspiration came from Warren Street, where buildings have varied parapets, some coming forward and some receding.
- The design mimics that rhythm to avoid a monolithic facade.
- Each of the rear apartment buildings also has entrances on the parking side and the park side, with the park side entrance intended for residents to access the park and sit outside on a patio.
Clarification and Closing Remarks
The board and applicant clarified the final package request and set expectations for the next steps.
Key points
- Bogle clarified his request was for an assembly project, not new work, and would take an architect only a couple of hours to write a narrative.
- He apologized to Jeff for finding a hot button and said the request adds no time to the process.
- The board discussed whether the request was for repackaging existing components or creating new documents; Sarah suggested it was unclear what specific document was being requested.
- Jeff clarified the team will consolidate the application into one place showing what the board is voting on, but will not redesign anything at this point.
- He said the applicant has submitted everything the board needs to vote yes or no, and has balanced site conditions, financial constraints, state program objectives, and community context.
- Bogle said only one more set of information-seeking conversations remains, with design architect Alex Gorland, before the record is complete and the board can deliberate.
- A board member interrupted to argue the project is urgent and people's lives are at stake; Bogle took a 10-minute recess.
- Jeff reiterated the team wants the same thing as the board: clarity on what is being voted on, a vote up or down, and to move ahead one way or another.
About this page
FUTURE HUDSON is an experiment in civic engagement: every public meeting of the City of Hudson since January 2026, transcribed and made readable, so any resident can follow what the city is deciding without attending every meeting. This page covers one meeting; see the full archive.
How it was made
The meeting video was transcribed automatically; the transcript was then organized into sections and summarized. The raw transcript is above, every claim can be checked against it.
What to be skeptical of
The transcript is automated and contains speech-recognition errors; names and numbers may be wrong. This page has not been reviewed by a human. Nothing here is an official record, the city's official minutes are authoritative.