City of Hudson, New York · Planning Board · Transcript

Planning Board, Regular Meeting

Tuesday, October 13, 2026 · 2:35:16

Watch on YouTube Back to summary
  1. 0:02Fogle here, Mr. Keepski here, Mr. Spear here, Mr. Michaelson, Mr. Woodhole here, Miss Black here, and Miss Confra. I am. Yes, I'm here online. I'm sorry. Uh, daycare last minute.
  2. 0:22I offered to babysit [laughter] and she said, I would love to bring him in. I just don't think everyone else would love that. [laughter] Um, [clears throat] so just for the record, Veronica is absent, but she can participate as long as the quorum is in present at the meeting in physically present at the meeting. Um, going to review the agenda for tonight uh before getting into the part of business.
  3. 0:45Uh uh initially we will do our regular meeting business where we will approve the minutes, approve previous bills, uh any liaison reports and discuss training requirements. Then we'll move into our business tonight which we have two items on the agenda. One is a public hearing for the Van Winkle Road project uh also known as Academy Hill. We have folks that have signed up to speak as part of the public hearing. And also under old business, we have um 41 North Second Street, which is the WJ commonly referred to as the Bliss Tower Replacement Project.
  4. 1:26Those are the only two items that we have on the agenda tonight. Apparently, there was some misunderstanding that there might be other items on the agenda, but that is the extent of our business on this night. Um, with that, uh, [clears throat] let's go ahead and begin, uh, dealing with our regular business, and that's the review and approval of our invoices, bills from escrow.
  5. 1:55Yes, we have bills from Cavender, Ryan, and Canary totaling $2,43250. These have all been reviewed.
  6. 2:10And that's the extent they uh these have been reviewed and they're consistent with the services provided. A motion to approve is order moves to approve. Is there a second?
  7. 2:30Call the role please. Chairman Mr. Mr. Fear. Yes. Mr. Mole. Yes. Mr. Woodhole. Yes. Miss Black. Yes. Miss Cogra. Yes. [clears throat]
  8. 2:50What's next on the agenda? Minutes. September 8th and 30.
  9. 2:53Motion to approve the minutes as distributed. Correction. Are there any corrections or edits to the minutes as distributed? Any corrections or edits? There a motion to approve as an order. Jane motel. Yes. Mr. Schedy. Yes. Mr. Spear. Yes. Mr. Michael. Yes. Mr. Woodhold. Yes. Miss Black. Yes. Miss Cogra. Yes. Please report.
  10. 3:32Uh we have relationships with two other agencies who are commissions in town. uh Peter and Nap any updates or comments?
  11. 3:42Um only one update from the conservation advisory committee which is the tree ordinance I think is sort of coming alive again if we have any feedback on that. Um uh it's put forward the legal committee but there there are things we care about about trees in the public way.
  12. 4:03Peter, nothing to report.
  13. 4:06Uh, I would, I guess, make a report on Peter be half. Uh, Phil Foreman, the chairman of the HPC, invited Peter and I over for a visit to join his board member, Cara Reagan. Reagan and unfortunately at the last minute, Peter had congregations, so I got more coffee and pastry as a result. Thank you. uh but it's just an exploratory conversation about how we might be able to coordinate our work together and benefit from each other's advice, council, and collegiality. So um um so that's the extent of that reporting. Thank you. And what's next?
  14. 4:47Training. Ah that's true. You all have 4 hours annual training requirement and some of you are close eer until the end of the year. There are many links online if you I can send you. [clears throat]
  15. 5:13Thank you very much.
  16. 5:15I think Nathan is half an hour short.
  17. 5:20Yeah, I mean an hour short and the rest of you I think are two.
  18. 5:25Can you send the link to all this? So Oh, sure.
  19. 5:28Yes, please. I was just going to ask for the link as well. And that's our business. Is that right?
  20. 5:36Yes. something. So, we're going to move to uh our first application, academy. Um uh before we open the public hearing, does the applicant have a presentation or Okay. [clears throat] Hi, good evening. Andy from the Brit Law Firm on the Japan Hill Development Corp. With me this evening is Sean Hitchcock, ABD Engineers. I'm a project engineer.
  21. 5:58We're here for the public uh hearing this evening. It's the extension of the uh Mount Ray project. Uh, as you recall from the last time we were here, this project was originally approved as a PDB about 20 years ago in 2006. Um, and it was constructed in phases. The the last remaining phase is nine units. It's three triplex buildings. Um, and when we finally came back in because it's been so long, the city uh in a wisdom said you should probably go back and renew your site plan approval uh because it has been a significant amount of time.
  22. 6:32So, so that's what we've been working through. uh we filed the application several months ago. We've appeared a number of times. Uh we think we got to the level where we could hold the public hearing tonight. Our primary interest is hearing from the board and the public in terms of comments. Um and we will take those back and respond. Um we got the Rian engineering comment letter today and we see we still have some work to do.
  23. 6:55Uh we thought we had gotten everything but but we missed a few. So, what we would propose to do from here this evening is uh get the public comment, get the board's comments, uh code the public hearing, and then let us go back and we'll respond both to the engineering comment letter as well as all the comments that were here this evening. So, um John is here to run you through the project if you'd like a quick refresher or to show the audience what it is and what we're proposing. Sure.
  24. 7:24Yeah. So, you know, we're just we're proposing the three or yeah, the three um three unit townhouse buildings on each lot here that was originally approved. Proposing same size that was approved, same locations, um setbacks, all the same same utilities. Uh the only changes to the site would be the storm water because um you know we agreed to upgrade storm water to current EC standards which will not only treat the storm uh runoff for water quality or water quantity but water quality which it did not do or is not currently doing. And from my understanding the storm water area is an issue currently. you know, our upgrades that we're proposing should significantly improve the storm water area uh for the HOA. And so really the only thing changing from the original proof plant is the upgrade to the storm water infrastructure treatment area.
  25. 8:27And there is a homeowners association for this project and they've submitted a number of comment letters and requests for information on the path. We are in coordination with their attorney. We will respond to all of their prior requests for information. as well any comments if they're here to see. Thank you for the opportunity.
  26. 8:43Sure. Before we ask questions, call in Rich and Andrew, there any background you want to provide?
  27. 8:50Um, I can just say as far as the technical comments go, um, I do feel that they have taken care of the majority of them. Um, our biggest question is probably still on the the setbacks that are shown. Um, if there's any way if you have any new update on that.
  28. 9:07Yes. Um, I had spoke with Mr. Clark late last week and agreed to investigate our files, my client's files, ABD's files to see if there's any type of specific narrative outlining uh, setbacks when PBD was approved. So far, we haven't been able to locate anything. We there are a couple other places that we can look, but it's it's looking to us like there was no specific narrative outlining setbacks. It was a map that was approved. So when they approved the PVD, they approved the specific site plan in the map and it was the setbacks as shown on the map that became the PVD setbacks. That's what we're starting to suspect, but there are a few more places we could look to see if we could find that.
  29. 9:46We can't find that map, I think, is that part the map we can provide. We can't find a specific narrative that says your PDB shall have this front yard, this rear yard, this sideyard, but we can provide the actual plans.
  30. 9:59Yeah. Does that have the bulk rigs that were approved at that time?
  31. 9:59No, it's just the map that we already submitted with the stamped approval on it.
  32. 10:07Yeah, that's the only map we have showing the sub tax as it's okay.
  33. 10:11Yeah, but we can measure from that map and I know one of your comments is provide a bulk table. So, we can we'll keep booking as well.
  34. 10:22Yeah, that's the bulk of my comments just addressing the setback issues as Mr. Brick uh spoke on here. I think we want to see what was approved and make sure we're in line with that, not increasing what was approved and if there are any minutes to the effect of what was approved. I don't think we found any yet. I fear we might be exhausting the resources soon, but we'll see if the applicant can turn into anything else and the map was approved and stamped.
  35. 10:48Yes.
  36. 10:52I do have a question before we move forward. We'll have the public hearing. At the end of the public hearing, we'll adjourn to a specific date. My question is, how much time do you think you need to uh accomplish the task that you have to accomplish?
  37. 11:08It's a difficult question. This is a large room and I don't know if everybody's here to comment. So, could you ask me that after the the public comment because depending on the volume of comments?
  38. 11:17Absolutely. Absolutely. As a matter of fact, that's a better idea for any questions before we move the public hearing.
  39. 11:24Okay. Have a mo. Thank you. A motion for convening the public hearing is in order.
  40. 11:33Shane second. Maybe you'd like to second. Okay. Sarah has a second.
  41. 11:41Jeremy Bogle. Uhhuh. Mr. Shy. Yes. Mr. Spear. Yes. Mr. Michael. Yes. [clears throat] Mr. Wood. Yes. Black. Yes. Miss. Yes.
  42. 11:54Okay, the public hearing is open. A couple of ground rules. Uh each citizen is uh allowed to speak 53 minutes. It's not to try to limit what you can say, but it's actually about fairness. Uh not just in tonight's meeting, but across all meetings. Uh all citizens have an equal opportunity to present their points of view. Um we we have been requested and have made a tiny exception tonight. Uh the the two of the speakers have a written statement they would like to read and so our attorney and uh and I have said that one of you read half of it and the other read the other half and that would be three minutes each. Don't get any other ideas about 10 people getting together and giving the authority one. Um we'd like you to state your name for the record. Uh that's just to help make our record complete. Um the the topics uh that are most useful to the planning board uh are dealing with issues of uh environmental issues uh sewer waste water kind of those sorts of of necessary but uninteresting things uh traffic issues um there are a lot of things that that are outside of our jurisdiction. For example, I don't like the way that building looks or maybe they should paint it a different color.
  43. 13:13Those are interesting issues, but they really are outside of our of our venue, our gallery. And so, uh, Jean, I'm going to ask you again if you would be the timekeeper. Thank you.
  44. 13:26That's his look when he's happy. You should see him when he's upset.
  45. 13:31Um and then of course after the uh comments uh we'll we'll adjourn and not close the public hearing and then we'll re-engage the applicant on on what their thoughts are as far as that's concerned.
  46. 13:44So this is the sign she would want to speak. This is for the the goal estate. Has everybody signed up that wants to speak? I don't think so. Let me see. Okay.
  47. 13:56I think you're the other place for this one. Yeah, put it back here.
  48. 14:18All right. So, good evening, Mr. Chairman, members of the board. My name is Rick Remington, RM IG TLN. I'm president of the uh Mount Ray Homeowners Association. On behalf of the HOA and our 65 residents, we want to thank you for allowing us to comment on this cycle plan as advocation.
  49. 14:38We ask to be heard because we have serious concerns that have yet to be addressed, including the document that we just saw today. At sign number one, at significant expense to the HOA, an existing retention pond located directly behind six of the planned units was excavated, drained, and reconstructed in 2023.
  50. 15:04We need assurances that no material excavated during the planned construction is deposited within a retention pond, that the retention pond will be in the same condition post construction as now as now exists. With no advanced notice to the HOA, we learned for the first time at a prior board meeting that the applicant proposed to perform work in this area in order to meet current storm water control requirements.
  51. 15:27The applicant's response regarding the retention plan in its September 29th, 2026 communication to the board is insufficient. We asked the board to require periodic inspections during any reconstruction of the main retention plan with the results provided to the HOA and that an enforcement mechanism be identified should the results be unsatisfactory.
  52. 16:01According to the minutes from the board's September 8th, 2026 meeting quote the ponds above the units and some are concerned they could step out back and into storm water. I don't know who told you that. I've been on the board 5 years and nobody ever told me that. No, the concern is the degradation had come within two to three feet of undermining the foundations of existing on road. That's the concern.
  53. 16:30Number two, because the development sits above the city reservoir, pump house was required to serve our community for domestic water and fire protection. We need assurances that the applicant will not enter this facility without prior notification to the HOA. Domestic water and fire protection service to existing units will be maintained through construction and at the ward reach out to the Hudson Fire Department regarding its water supply needs during fire emergencies which have happened in the past.
  54. 17:00Chief Hoffman advised the HOA that the planning board has been diligent in consulting with the fire department.
  55. 17:1130 seconds.
  56. 17:13Construction of the Malray States pump house was completed in 2006 and it's now experienced 20 years of continued use. The intention and insuranceances by the developer in 2006, 20 years ago, was that the pump house must have the capacity to serve 50 units. Additionally, that the pop house would be legally conveyed to the HOA on completion of all the units, which again was supposed to have been 20 years ago.
  57. 17:44Okay, time for the handoff. We passed.
  58. 17:52My name is Carol Freriedman. I live at 12 Hill Drive. Um, Rick was just talking about the pump house and there was more about the fact that we've incurred expenses to maintain that pump house. I won't read the rest of that paragraph, but I ask that you look at that. Um, and we have other concerns and that is that the board require evidence of the applicant's longstanding disregard the interests of existing residents.
  59. 18:20need look no further than the construction management plan submitted on August 30th. Section 4 proposes construction hours of 7 a.m. to 6 p.m. Monday through Saturday within an existing residential community consisting primarily of elderly retirees. While this is no this no doubt would serve the applicant's interest to limit construction costs, the fact that this is excessive and provides little relief for the residents of the HOA would be an understatement.
  60. 18:56The HOA asked that the board narrow the hours of construction to from 9:00 a.m. to 3:00 p.m. and prohibit any construction on Saturdays. Um the high managed 3DM schedule would conform with the deliveries.
  61. 19:08Also, current residents need existing access to their homes preserved. Controls on construction traffic should be more adequately addressed for its impact on the HOA as well as Rossman Avenue. Also, we have um a bullet about dirt and dust abatement that it needs to be more adequately addressed than what the applicant has um put forth.
  62. 19:43Uh the HOA also asked the board to require that once construction is complete on the remaining nine units that the applicant will bear responsibility for completing the necessary upgrades to our road which they have they are supposed to do. Um we're we're asking that they also bear responsibility for adding required mailboxes.
  63. 20:11Um, we're also talking, we also have concerns about runoff during construction to ensure proper storage and disposal of construction materials and debris. 30 seconds to ensure proper storage and use of all compounds that they use during construction that they provide with its construction staging plan. uh description of where materials, equipment, and dumpsters will be stored on the property and how equipment and materials will be secured. We want to identify where construction workers will be instructed to park. Parking already is constricted with few options now available for visitors. We ask the board to direct the construction parking.
  64. 21:00So, Carol, thank you. Thank you. This document you can submit to Linda. It will be posted in its entirety and become a part of permanent writing and that gives you a good road map of issues that you'll need to be responding to.
  65. 21:15True. Would you have an extra copy this evening to get started with?
  66. 21:18We have extra copies for Thank you both and thanks for understanding the restrictions. Um get going.
  67. 21:32Oh, I'm Hi, I'm Nicole. I'm from Alan Sweden. Um, and these questions might not be relevant, so just tell me if they're not. So, I I can't see, but where it is that there units or three separate three build three development 3* 3.
  68. 21:52So, these are in front. There's nothing there.
  69. 21:56So, they don't block the view. They're not built in front of any buildings already in there. Right. Right. Right. So they don't block anyone's views. Like it's not going to be in front of somebody's already bought their place and now there's a new townhouse in front. So, and my other question, maybe you can't answer this, but I've been curious as the projected price of the house system.
  70. 22:24[clears throat]
  71. 22:24Um, is it okay for me to answer? I'm sorry. Is it okay for me to answer? She asked about Absolutely. If you'd like to. I don't
  72. 22:35[laughter]
  73. 22:37what what I can tell you is that during co our realtor was getting people calling and asking and looking for those obscene amounts of money to live in that area. Um that has tailed off a little bit since co um clearly we would do our best to make them marketable but with the cost of construction nothing's cheaper. We we we'll try and make it, you know, cost effective, but we have to use the same materials and outdoor siding as the other ones to match the other ones perfectly. So that increases the cost a little bit. So um they I think the final purchase price it definitely won't decrease property value in that area. These purchase prices I think ultimately probably starting up.
  74. 23:26So I want to comment on the value of public hearings before we adjourn unless there are other speakers. Okay. Um I think our experience with most post most most recently with the housing authority public hearings uh it's gratifying when we see people come prepared ask serious questions uh interact with each other in a respectful and collegial way. we're all neighbors and seek to uh get to solutions where there's more of a win-win. And I think the homework you all did, Carol and Brett, is that right?
  75. 24:02Brett Brett was showed, you know, real responsible approach to the developer and owners. And uh so I want to thank you for your participation. And with that, how much time would you like to keep the public hearing open? How much time do you need?
  76. 24:18I I would like to devote the time necessary to address all the concerns raised by the HOA. Um I wouldn't want to rush and try to get on the next agenda. Could we be adjourned to the December meeting?
  77. 24:32So if we close the hearing tonight, that starts a 62-day clock.
  78. 24:37We would wait a 62-day clock and it will be placed upon December 9th. Huh?
  79. 24:41You can adjourn the hearing until December.
  80. 24:46Well, then we're the close of that only two months, but that's December. He says he doesn't want to be on November or January. That's a safe that's safer here.
  81. 25:01Yes, if I may. Uh, can we ask that the public hearing is continued? There's more information that just brought. We've had no opportunity to That's exactly what that's exactly what I was just meant to do. Thank you. Adjourn it means we'll continue.
  82. 25:16Yeah. So if we close it, that means it is. If we adjourn it, that means we're just putting it into by adding and we're going to continue doing that. So that's our request. Thanks. Uh so uh the a motion to adjourn the public hearing to December the December meeting of the planning board is in order.
  83. 25:34So you did it first.
  84. 25:38You do it first. [laughter] Listen to you two might have to separate. Um, Cherry Bogle, yes.
  85. 25:45Mr. Sheen, yes.
  86. 25:46Mr. Spear, yes.
  87. 25:48Mr. Michael, yes.
  88. 25:49The board, yes.
  89. 25:50Miss Black, yes.
  90. 25:51Miss Cer, yes.
  91. 25:55Um, before moving on to the next item in the agenda, I'm going to uh declare five minute break. And for those who are finished and want to leave, this gives you an opportunity to do that. So, let's reconvene the meeting.
  92. 31:10Uh I'm going to lightly review the steps that we have uh tonight. Uh first, we're going to engage the applicant in any remaining questions that we might have.
  93. 31:21Um and once we have ga completely or gathered the information that we seek, we will transition to board deliberations where we will now begin to address each other uh regarding our feelings and thoughts about the project, asking each other questions, advocating for potential uh conditions, etc. Um, if a condition is suggested by a board member, uh, the board will discuss and I'll take a straw poll to see if the board wants to include that condition or not.
  94. 31:52Of course, we'll also make sure that we run any potential conditions by uh, Andrew or Rich to make sure they are within the authority of the planning board. Um, then when we conclude our deliberations, we may or may not vote. depend on how we're feeling at the time.
  95. 32:08If we do not vote tonight, I think it's likely because Andrew will need time to finalize the proposed um uh resolution and conditions and members will want to have time to review the final resolution and conditions before being asked to decide on them. So, I will ask, if that's the case, I will ask for a special meeting on October [clears throat] 26th rather than waiting until our November meeting for the next uh opportunity to deal with this.
  96. 32:31Um although the applicant did say that they would uh be willing to negotiate the 62-day deadline, which falls the day before our meeting, I honestly see no reason to wait until that point uh to uh finalize the process. So, [clears throat] that's something we'll decide at the end of this discussion tonight. Um, any comments about our process going forward? Uh, I'd like to call on Fed Dawson to make some opening comments from the HHA.
  97. 33:10Good evening again. Uh, thank you for having us back uh to this uh very important forum. Uh, it has been exhausting, but it's testing our character. We will not give up. Uh community is important to me as community. It's important to the people that I represent.
  98. 33:25Um and we are determined to make a better use of the space that we have. Um so we're urging you to uh conclude the matter and uh take a vote um and vote up and approve our site plan for this project. Um we like to introduce John Mattio who will take us through uh some of the other things that we want.
  99. 33:51Mr. meeting everyone. It's nice to be with you again. Seriously, uh and all the public out again, which is very important part of this process. A couple quick comments. Um primarily for the record, uh but also for the public that may not know what's been going on the last couple of weeks since the meeting on the 30th.
  100. 34:07Um we were asked, the applicant has been asked to provide certain additional information. We're asked to provide the storm water uh pollution uh plan uh which we have done. We've been asked to revise the site plan to remove a couple of parking spaces to allow better fire truck access, which we've done. We were asked to uh prepare a uh succinct project narrative so the board will know exactly what it is, what's the project you're voting on. and we've been asked to um submit uh the plans, the elevations, uh the civil drawings all in one place at one point.
  101. 34:50So again, so the board has that all in front of them. Um and we've done that. Uh we've also been asked to bring back uh our design architect, Alex Corland. He is here. Uh we also have the rest of our design team. I think we have you outnumbered by one or two people, but you know, I I think you'll hold your own.
  102. 35:06Um I think that uh the uh uh last thing that I would say uh procedurally is um uh we have you're used to seeing John first here uh who's our attorney. He isn't able to be here tonight but we are represented by council uh Joseph McCay his partner. Um so if there are legal issues that need to be discussed go oh I was right behind uh so he's here so he can participate if it gets to that point um where uh you need an opinion from us on on something.
  103. 35:38Um, the last thing I will say, uh, and and I mean this sincerely, um, this community should be very proud of this planning board. No matter how you vote on this, okay? You vote up, you vote down, that's that's, you know, decision you have to make the work. I've been going to planning board meetings for over 30 years, right out of junior high school, [clears throat] right?
  104. 36:02And uh and I seriously I've never seen a planning board that's worked harder and has given the applicant more ability to come in and present uh its plan and given the public more opportunity to uh to come before you and and to express their opinions in favor against the plan. Um and uh uh that's something that I I believe that the the city should be very proud of uh what you guys have done.
  105. 36:27Um, so I'm going to stop there and then uh we don't have that. We submitted everything to you. You have it. Uh, we're not going to make a presentation, but we are here to answer any questions if you have it.
  106. 36:40Okay. So, I asked Andrew and I had a call with John uh just to review uh details. John first, the attorney for HHA, just to review some of the details moving into this phase of the uh of the process. And I asked John a question I'd like to ask uh on the record. U and by the way John answered in the affirmative to this question. Um so first I would like to acknowledge that you submitted a comprehensive uh site package uh site plan package and um as we discussed in our last meeting uh that represented a serious effort to really bring together the materials that you're asking us to decide on and I thank you for that. It may feel sometimes like we've asked for more information and more information but as we move toward our deliberation and decision making uh that package was very helpful.
  107. 37:33The question I asked John is is HHA representing that this package together with whatever earlier supporting materials it specifically continues to rely upon defines the phase one application on which you're asking the board to act. And just for the record, uh he answered in the affirmative and I would ask Joseph the same question.
  108. 37:58Yes. Okay.
  109. 38:01Was saying I do I don't [laughter] uh there's a lot of ways I could go with that.
  110. 38:09So um why don't we bring your team forward so that we know who's here and I'd like to propose again like we did last time a board that we kind of treat this as a round robin. So, um, once you have the floor, we'll ask the questions until you feel that you've gotten the answers you need. Um, if a question has been asked and answered, um, um, we may want to move on, but, uh, we'll just play that by ear. This is quite a lineup, isn't it?
  111. 38:42If you would like, Mr. Chairman, we can go around and introduce.
  112. 38:45That would be great. I'm Brian Brooker, engineer for the applicant.
  113. 38:50John Mattio Falco, Joel McKay, and Ryder McKay. I'm here tonight for John first for the housing clarity architect.
  114. 39:01Uh, Alex Gorland, Alexander Glowing Architects, designer Alex from Kimon, helping out with traffic and pocket parking for the project. I'm the environmental consultant.
  115. 39:15I'm Joel. from the principal of Malcol and it's me. [laughter] I haven't seen you right before. Well, thank you all for being here tonight.
  116. 39:25This is uh the beginning of the conclusion of our question and answer time. So, who would like to start the [clears throat] process?
  117. 39:37I'll start. Um I have questions for you. I appreciate you being here. Um Mr. Morland. Um, I just want to pick up where we left off last time. I know people think I'm fixated on this piece of copy and the responses about the entries and the configuration, but when I asked you about it, it seems very clearly to describe um, you know, more human scale. [snorts] I asked you about it, you you responded as if it were a design that you changed. You said that with an old design and we changed it for security reasons. So I just wanted [clears throat] to ask you again if that is in fact what happened um and why that articulation that building was described in that way in that response.
  118. 40:20Uh that was an internal miscommunication and the description uh was incorrect and it never matched the plans that were submitted that were voted upon [clears throat] uh not at any point. We never had more than one entrance. In fact, uh the second entrance to the community room uh was put in at the suggestion of uh Ron Bogal in a conversation. So, um I apologize for the text being dawn and uh that is that is what I have.
  119. 40:58And when you responded and you said that it was a different design and you had changed from that design for security purposes and then here what were you addressing? Uh I was addressing the fact that uh the security needs of the housing authority uh require one entrance for security reasons and uh that was that is actually what is in the plans and anything uh whatever I said previously was incorrect.
  120. 41:26Want to clarify? I think I might have made that made that also was not involved at the very beginnings of that. So there might have been a change I was not aware of. After the meeting, I was able to talk with the team a little bit more about previous and know that there had never been a change is what it was. So, I might include some of that conclusion. So, I don't know.
  121. 41:44Yeah, it was just confusing. I mean, my feeling is that the that the description in that plan is a better plan. It seems like it's better for residents and it's better for Hudson. uh and it seems significant that you would describe something that positioned itself against the final plan arguing against an institutional lobby arguing for neighborhood scale in the document and then pull it back. So, it's significant that it was there. I understand that there was miscommunication across the team. Um, and I'm a little bothered by the fact that your attorney in the last meeting basically said that you had been regurgitating the comprehensive plant in response to direct questions about the configuration to defend um an institutional scale lobby um from uh you know you just sort of misrepresented the the actual design of the building.
  122. 42:37Uh again, at no point did any of the plans going back two years show more than one entrance. The second entrance was added um in the middle of May.
  123. 42:48Right.
  124. 42:49So the the description was incorrect and I apologize.
  125. 42:54And um I think on the site plan visit in um [clears throat] describing the facade articulations there was some reference that they would be like Warren Street. And I'm wondering in what way are they like Lawrence Street?
  126. 43:08Uh in my presentation in May uh I uh which I believe is in the public record uh every image uh on Warren Street has an address on it and each image can be uh found on Warren Street and it it's the full length of Warren Street from 1st Street through 7th Street. So uh that was the basis upon which uh we uh related the better part of of Hudson, New York as an inspiration for our facades.
  127. 43:46And h how is that manifest? What qualities of the facads of Warren Street will be on this building?
  128. 43:52All right. as I showed in that presentation at length uh the articulation vertically of a uh a townhouse type of scale. Uh vertical windows which are more classical as opposed to horizontal or square windows. Uh we have a number of uh bays uh that project out to break up the facade. There are insets uh and projections out of the facade to break up the scale both in plan and in uh elevation in the parapits that rise up.
  129. 44:29And is there anything about the the dimensions of it that are particular to Warren Street?
  130. 44:35Uh they refer to Warren Street in a sort of a general way proportionally. I see. Well, thank you very much. Um I noticed in the final package that there um there had been lots of talks about sustainability commitments in the earlier documents and in the final document there's no reference to sustainability commitments with regards to the project. Is that accurate?
  131. 44:58I again our understanding was that you were looking for a specific um uh a specific concise description of the project you were voting on. We could have made that description 50 pages including everything. Okay, we highlighted the specific uh items that you have to look at, height, number of units, location of buildings, dimensions. Okay, uh the fact that we didn't refer to sustainability or whether you know what type of mechanical systems we were going to use. Those are details that we didn't think uh made sense to give you the specific uh concise plan.
  132. 45:38Okay. I had a different expectation of that document, but I understand. And then finally, there's been lots of talk about North F north North First Street in in in many redevelopments of urban renewal sites, there's a desire to restore the grid. Um, and this project does not do that. Um, but North First Street now on this final package, you've put an address on that entrance, called it one North First Street. You've claimed the street for yourselves and I'm wondering if that means that you're actually restoring the grid or are you just just sort of putting names on things.
  133. 46:14It's just a representation of what text what a name what an address was. It's on it's facing first street. So we used first street as the address. We used a state street as the address for the the vehicle.
  134. 46:26But it's not a it's been characterized as a parking lot.
  135. 46:30Yeah. It's it's it's that's why it's just a representation of what the text would look like on that. When we get an official address, we would put the proper address on it.
  136. 46:41And I think the address is actually going to be dictated by the post office usually.
  137. 46:45Yes. I mean, again, that's what I thought. I thought we were going to get a factual representation of the Well, we we haven't had that discussion.
  138. 46:52Yeah. We we can't apply for that right now, but that's that's where the number is going to come from.
  139. 46:56Thank you, Peter.
  140. 46:59Any other questions? No. Anything I have question all my concerns were addressed with meeting before the documents that they submitted. So having I'm beginning to feel very subconscious that you all are standing there. Some of you have maybe could talk about something else. I don't have that. Um [clears throat]
  141. 47:28Sarah no. So I have a question. Oh Veronica. Sorry.
  142. 47:35And she has to make herself visible whenever she speaks. [clears throat] Sorry. Um I I don't have any questions though. All my questions have been answered.
  143. 47:49You have to show your face. According to Linda [clears throat] think she's having a bad hair day. Okay.
  144. 47:59Hello. It's really me. [laughter] I'm all my questions have been answered either from myself or by other people. I'm I have no more questions. Thank you. [laughter]
  145. 48:14He may have a couple questions.
  146. 48:19I I have some questions, but I believe they're more directed to our engineer and our attorney. So, um if if once I ask these questions, if someone wants to uh uh speak up and and be a part of the answer, that would be super. But otherwise, uh it's been great looking at you. I'd like to get a good picture if I could, please. And thank you for your responses. Thank you, board, for your questions.
  147. 48:40I want to explore just a little bit about state requirements. They're seeking and um the um I mean we we we we voted in May for a negative declaration in secret and um and I just want to make sure that our decision from that period remains adequately supported. Um, I I have a lot of questions, but I'm only going to kind of frame a few and then let you all riff on this.
  148. 49:09Um, since May, we received uh revised plans, additional environmental and engineering information, questions about soil conditions, um, groundfield issues, proposed solutions. The concerns been raised about whether the project has changed sufficiently to warrant further u review and evaluation. So I guess my question first is does the existing seeker determination and it really need address um the issues that have have occurred since uh the action that we took in Maine or have new developments with the project required us to reopen or reconsider our decision? Andrew.
  149. 49:55Sure. So without getting right to that maybe some build up. So just to frame it for everyone seeker that's when we're looking at the full project that's inclusive of phase one and phase two fully built your determination through seeker you're seeing if there's going to be any adverse environmental impacts by the construction as proposed and if those adverse impacts can be mitigated. So the intent of seekers is to view review all the potential impacts at a larger scale and that's the consideration.
  150. 50:17And I know there's been a lot of talk about whether the project has changed, whether there's additional seeker review required. Again, that's a board determination. But the key threshold is whether you sufficiently reviewed all aspects of the project and pursuant to uh our regulation 6 NYCR 6171.
  151. 50:49At any time prior to its decision to undertake, fund or approve an action, the lead agency, this board at its discretion may amend a negative declaration when substantive changes are proposed to the project or new information is discovered or changes in circumstances related to the project that were not previously considered. So, I know there's been a lot of additional details submitted to the board. The consideration is whether those were not adequately uh considered and addressed by the board in its seeker determination.
  152. 51:28Uh keep in mind courts have actually stated this that it's not the role of the court's way, the desiraabil the board's way of desiraability of any action or choose among the alternatives. rather you're supposed to satisfy the secret process and take your hard look at the project, make sure you've reviewed everything in front of you. So, if there are any specific questions about this, I'd be happy to answer it. I think the the concern is have all these submissions to date changed anything that's really a board determination? it could be open for some discussion and I think Rich might opine on some of the materials that were submitted to us but from what I've seen in the material submitted to you it's more of the details of these plans and how things are getting accomplished rather than any changes to the plans but again any questions chairman if I could could comment uh I would agree
  153. 52:28with the uh the attorney and just Mind the board plans have not changed in any substantive way from when the se when the application was submitted and the secret review. Same number of buildings, same location of the building, same type of the building, same dimensions of the building, same number of units. Okay, all of those fundamental aspects of the project have remained exactly the same [snorts] throughout this process. That's one of the the comments things have changed. We certainly provided more information and we certainly have provided more detail but the fund [clears throat] fundamental aspects of the application that you have before you have not really significantly changed in our opinion. Thank you Rich.
  154. 53:14Tell what's your um I my observation is that um we as the engineering consultant have asked for a lot of information um because we want to for this this board have any kind of final plan set for it to be thorough um and they have responded with a lot more information and a lot more detail. for example, just the the plan set itself has grown in number of sheets. Um, and that's what we want to happen and and we want that for when there is a final site plan document that everybody asked the chairperson to sign all the detail is there. So, it's I think it's a matter of more recordkeeping. I haven't seen anything that's changed anything substantially.
  155. 53:54So does the existing SER determination adequately address the possibility uh that uh phase one is completed but phase two including the demolition of twist towers is substantially delayed or never undertaken.
  156. 54:10So the application before the board now in seeker we looked at phase one and phase two so fully constructed that includes the demolition and as I understand it that is the current plan before the board. Phase two isn't before the board, but your seeker determination contemplates a demolition. And if that were to change at some point in time and that demolition were to be taken off the table, then the board could revisit its seeker determination and look into new mitigation measures at that time. Okay.
  157. 54:43Any other comments from our adviserss?
  158. 54:46Uh let me pose the question to the board then based on the recommendations of our attorney and our engineer. Uh do you see any need that our uh we need to revisit the seeker or take further action in regard to our decision in May?
  159. 55:05I do.
  160. 55:06Okay. Thank you. Thank you both. And I guess I would just put a foot on thank you for your contribution is that we're a group of lay persons and there are aspects of the decisions that we're asked to make that are quite technical quite a few actually and so we really have to rely on the recommendations and advice of our of our experts and especially in this regard because the state is very specific with the secret process what its expectations are and what the thresholds for approval are. So I appreciate revisiting that and kind of reestablishing for the record that uh we have carried out the secret process in a proper manner.
  161. 55:47Are there any other questions that any board member or our attorney or engineer would wish to ask uh either the applicant or board.
  162. 56:00Okay, we're moving now from information collecting to deliberation. So, we're concluding that all the information that we need to make an informed decision is now in our hands. Uh, and I certainly think that we've chopped down a lot of trees. Uh, the information that's been provided has been wholesome and uh, helpful. So, now we move into our deliberation.
  163. 56:24Um, so I'd like Andrew to briefly review the applicable standards under city code section 325-35 that will guide us in our deliberation.
  164. 56:38Sure. And this is good to frame the board's uh thinking as to why they're here. I know it's been a while since the application was originally proposed. So the applicants here because site development plan approval is required pursuant to code. And just for everyone's benefit, that's 32535 in the city code. Now, if you go to section H, it has duties of the planning board procedure. I'll just give you a brief overview. Grounds of the planning board's decisions shall be based on shall be stated on the record, including where applicable any conditions or modifications deemed necessary by the board for approval. Subsection two, grounds for approval.
  165. 57:17In [clears throat] considering whether to approve a site plan or site plan amendment, the board shall take into consideration the public health, safety, general welfare, the general purpose and intent of this chapter, the comfort and convenience of the public in general and the residents of the immediate neighborhood in particular and shall base such decision on the following grounds. Then we have subsections A through H. So I'll read those quickly for you as well.
  166. 57:49Maximum safety of pedestrian and vehicular traffic access and egress site layout which would have no significant adverse effect effect upon any adjoining or nearby properties by impairing the established character or the potential use of the properties in such district. the reasonable screening at all seasons of the year of all playgrounds, parking and service areas from view of the adjacent residential properties and streets. Conformance of the proposed site development plan with the city of Hudson comprehensive plan and where applicable the local waterfront remilization program.
  167. 58:31In applicable cases, a drainage system and layout which would afford the best solution to any drainage problems. All water bodies, wetlands, steep slopes, and other areas of scenic ecological and historic value shall be preserved in so far as possible. Landscape treatment should be provided to enhance architectural features, strengthen vistas and visual corridors, and provide shade.
  168. 58:57No material or equipment other than as shown on an approved site plan shall be stored in the open if it would be substantially visible from adjoining properties and public roads. Storage of equipment and materials should be within wholly enclosed structures approved for such use or should be screened from view by fencing or landscaping or a combination of fencing and landscaping without restricting the permissible limits of the applicable zoning district. The height, location, design, and signage of each building should be compatible with the site and the existing historic character of the surrounding neighborhood. Adaptive reuse of existing structures is strongly encouraged.
  169. 59:40So again, those are the board's considerations when you're looking at the site development.
  170. 59:47Any questions for Andrew?
  171. 59:51So uh what I propose for the ground rules for our deliberation is we follow the round robin again uh allow board members to speak in whatever order you choose while a board member speaking they have the floor. Uh if you want to interrupt a board member to ask a question or maybe ask for clarification I suppose holding up hand and and not just interrupting would be better. Um I think that there may be out of the deliberation there may be ideas or suggestions for conditions that you wish to make. And so what I would suggest is if you want to if you want to bring a suggestion for a condition to the board to discuss that we set aside the roundroin for the moment and open up a discussion around that potential uh condition.
  172. 1:00:37um we won't take a formal vote, but I think maybe a straw poll at the end of the discussion around that contingent condition would be in order. And if the straw poll is ambiguous, then perhaps then I might call for a more formal vote to see whether it needs to go into the proposed um final documents that Andrew will create for us. Um this is our opportunity to kind of talk about what we think are the strengths and the weaknesses. This is our conversation with ourselves. Um and um may we just pause see if there are any questions before we proceed. Does that sound like reasonable process teacher?
  173. 1:01:18I will say I am confused about what's the dance between we're going around but we're also not going around if we have a condition.
  174. 1:01:27Yeah. If you want to make a con, if you have a condition you would like proposed proposed and we move into a discussion and then after the discussion is resolved, we move back into the round.
  175. 1:01:38Copy.
  176. 1:01:40Um we're going to start then with Rich who has uh several conditions that he is recommending. Um, after you've read each one, I'll just ask the board if you have any questions or um observations about that particular uh condition. Can you take the floor?
  177. 1:02:01Uh, sure. Sure. Um, to start out with the four conditions, um, we did we received the new the submission last week. Um, and our office went through in detail. We created a a comment memo um and very specifically pointed out additional items or maybe notes but uh very uh specific items not asking for any new information anymore. Uh they have adequately provided the information we've asked for. Uh so we have that memo uh which we are saying can be like a final condition. um [clears throat] included in this memo. I just wanted to point out to everybody, we uh took some time and we went through the comment responses that were received. Uh there was a lot said uh right to what uh Andrew was reading about what they have to prove that they meet the requirements of the code. So in order to do that, they did uh offer up different items that they would uh offer to do and that was in their comment responses. So in addition or attached to the memo is something we're calling supplementaryary site plan requirement notes. So we went through and pulled together everything uh that was said would be done and we're asking uh for that to be added to the the site plan and that's to organize everything and get it into one spot.
  178. 1:03:22Is that in the if I were to hold that up? Is that in the in on the grub or
  179. 1:03:30um I I think it got uploaded. It just was emailed out this afternoon actually as I was driving up there. Uh but it's so it's our memo dated October 13.
  180. 1:03:45Yeah, I saw that. Yeah, you see that? Yeah. Yeah.
  181. 1:03:48So, I just I just wanted to explain what those supplement what the idea of the supplement notes. uh are it's not anything new. It's everything uh starts at number one and it goes through 20. Uh so it's everything that the applicant has said additional items that they would do.
  182. 1:04:07So we just wanted to get that documented and get it listed in the site plan because then it makes it a complete site plan. I'll answer your questions.
  183. 1:04:19You're asking this be included in the resolution.
  184. 1:04:22Uh yes. So uh we put this together um and then at the previous meeting I think given a a draft of uh conditions potential conditions uh to get everybody thinking about that as well too. Uh so then we revised that list as of today's date and I think everybody has a paper copy of that. Um so I'm thinking would would you want to go through them third number one and I think maybe quickly we should go through them. So we're getting that discussion on the record.
  185. 1:04:53But but first on the document that you just talked about, we're just asking is there any objection to including this in the final resolution?
  186. 1:05:03I have comments on some of the specifically there's a few of them that this sounds vague. Um the vibration section in particular just says generally accepted standards to be agreed to.
  187. 1:05:19Yeah. Well, we're the way that we looked at that is we were giving them time to do their engineering and have their professional provide something uh that could then be reviewed. So, the way that this would work is uh a conditional approval would say that they have a conditional approval, but the chairperson would not be allowed to sign the map until they met all those conditions. So the the thinking on something like that is have your professional geotechnical engineer prepare what that would be and then submit it for review. Okay.
  188. 1:05:54And then what what we're accustomed to is that we would review that. Okay.
  189. 1:05:58And uh we wouldn't check check it off that it was completed until we felt that it actually met the requirements of what uh what what the general engineering standard is.
  190. 1:06:08So as long as it's that's a there's a process there.
  191. 1:06:11Yes. Yeah. And that's very routine in case of a moving on. Are we ready to move on, sir?
  192. 1:06:21Okay. Why don't you run down your list for us?
  193. 1:06:23Okay. Number one is payment of all fees and escros. Any objection including that? That's standard boiler plate as well too. Um, so number two is the filing of the approved subdivision uh plan sheet with the uh county clerk's office. Part of what you're approving is a minor subdivision. Uh so we have that in the the comments as well too that at some point we we have it as one of the sheets in the plan set but there does need to be a standalone single sheet that gets filed to create that subdivision.
  194. 1:06:53S I have a question. Are you going through your September 30th checklist? I know you got an uh no 1013 you're talking about the conditions
  195. 1:07:11very very similar.
  196. 1:07:14So after Rich has read his statement there are no comments. I would assume that's a sign of approval. Yeah. Okay.
  197. 1:07:21Okay. Uh number three is approval of water and sewer connections by the city. That's standard as well. Um number four is approval of all city road rightway improvements. Um so you have site plan sets improvements happening um in the city rightway. Um ultimately we we need the city department of public works to sign off on that. But that's the applicant's job to go ahead and uh do that. So that's number four. Number five is approval of all temporary construction uh road link closures by the city of Hudson department of public works. Again, that goes to their rightway improvements. Um number [clears throat] six is provide a detailed construction, traffic and logistics plan acceptable to the planning board engineer and the department of public works. So in their latest site plan set there is a a draft version which we have some comments on but ultimately that does need to be approved by department of public works.
  198. 1:08:21Uh number seven is the preparation of a comprehensive construction logistics and construction management plan appropriate to the final scope and sequencing of construction activities acceptable to the planning board engineer and department of public works. Uh this is a condition as I think we had mentioned in the past uh because they're not at the point where they actually have building permit drawings. Uh they don't have a contractor on board yet uh that we know of. But typically this is something that would have to come at a at a later time once they understand how they're going to build the project, do the the demolition that they have to do now uh and do the infrastructure construction.
  199. 1:09:01Uh number eight is final acceptance of the project swept by the planning board engineer. We did get the revised uh copy of the SWIP. Number nine is the New York State DEC approval and issuance of permits for the sewer extension and storm water speedies. Uh GP025-00001, that's the standard storm water construction permit. Um number 10 is New York State DEEC approval and issuance of permits for the brownfield cleanup program. Number 11 is New York State DEEC approval of the projects with and issuance of of I think that's that's a carryover with the other one.
  200. 1:09:43So on number nine, I'm just going to cross out the storm water part and we'll make number nine just the sewer extension and then number 11 is New York State DEC approval of the SWIP.
  201. 1:09:56Um number 12 is calculation of the performance fund um for the required infrastructure uh demolition and improvements and that to be reviewed by the planning board engineer at that time. And what we would do is we review their their proposed bond number for conformance with what the generally accepted costs are uh to make sure that that's keeping up. It's not over and it's not under.
  202. 1:10:23And then number 13 is furnish a performance bond or other security sufficient to cover the full cost of the required infrastructure and improvements. And then as a comma we have including the removal of list power and that's to be discussed. Um number 14 is furnish a pre-construction building or property condition survey. Number 15 is furnish a vibration monitoring and mitigation plan for the site's proposed geotechnical improvements. And number 16 is address the planning board review engineering comment memo date in October 13, 2026 to the satisfaction of the planning board engineer. So that's what we're proposing at this time.
  203. 1:11:02So um throughout the conversation about this application there's been exploration and discussion about uh the fact that Tyler remains until phase two and board members have explored different sometimes creative possible routes to addressing that issue that might resolve that bliss tower could come down under different circumstances.
  204. 1:11:31The language that uh Rich had in this document in your last version, I think articulated a specific idea about an about a way that we might uh ensure that list would come down sooner rather than later. Our attorney has offered an opinion though that uh really limits our authority in this regard and I'd like to turn it over to you and have you take us through the conclusion that you've that you've reached from a legal standpoint.
  205. 1:12:01Sure. Maybe just some framing might be beneficial from everyone. There's a lot of thought about conditions of approval, but it's important you understand how we're even able to do it. Well, your code explicitly uh permits it. 32535H1 the grounds planning board's decision shall be stated including where applicable any conditions or modifications deemed necessary by the board for approval. So conditions of approval are uh designed to mitigate an impact created by the site plan as proposed to the board and the conditions have to have a rational nexus and be related to the plan pending before the board.
  206. 1:12:39Now the the issue, if you can call it that, of the plan pending before the board is it's not inclusive of the demolition. This plan is limited to the other parcel where the existing bliss towers is part of phase 2. It was considered in the full seeker review, but it's on a different property, not part of this application. And if you go through phase one, this if it was approved as proposed, it's not exactly creating a condition with the existing GW tower. The tower is existing today and it's existing tomorrow. If the applicant were to withdraw this application, the tower would remain and it would be fully code compliant as far as I'm aware.
  207. 1:13:23So the only condition being created through this application is the vacancy created in that tower. So that is something that the board could rationably and reasonably regulate whether that be providing some sort of security and maintenance plan for that tower during the period when it could be uh vacant but not yet demolished.
  208. 1:13:54But this application is not creating that tower. So, it's not not clear that requiring a demolition bond would be a valid condition within this board's authority to do so. Now, it's important you look about what could be within your authority where the applicant has represented there will be this phase 2 application and the tower will be demolished. And I think this board obviously had picked up on some appetite to see that happen and some uh kind of continuation. So I think something rational and enforceable [clears throat] could be that within 24 months that applicants shall sub at least apply for this phase 2 approval with the board and uh be kept reasonably informed of funding status of phase 2 and kept apprised of the possibility and likelihood of it going forward. Because if phase two does not go forward, then this board's seeker determination inclusive of demolition would have to be revisited and we would have to get the applicant back in here and look at mitigation measures to go towards that bill.
  209. 1:15:05So I I said a lot. If you have any questions, feel free to Can I run that back?
  210. 1:15:11Which part? Just so you're saying because the demol because the demolition is part of phase one and not before us I'm sorry phase two and not before us we we can't it's we can't legally pursue item 13 to furnish but we could well not all of that.
  211. 1:15:34Now your your code does allow you to require the performance bonds for improvements. I see. But yes, but not for the So the removal is where the issue but we could we could include conditions that as far as what the conditional this paper is meant to do. Conditions that the building is would be vacant, right? Would not like uh remain operating.
  212. 1:15:58And um and then I'm also hearing that there's a kind of there are layers of um connected processes that would make it very much not in the applicant's interest to leave the building standing like that we could pull our secret determination and a lot would be on the line potentially.
  213. 1:16:20Yeah, you're right. Because the secret determination was inclusive of it being demolished, right? and that is with phase two and there are representations that this application will be brought and phase two will come before this board right but I think you want to know when that's the main question so what I'm hearing is we put a condition that if they haven't started phase 2 application process within 24 months they would need to come back to the board and give us an update of what's going on yeah to potentially revisit the secret reopen secret deter termination and apply mitigation measures at that time.
  214. 1:17:03And I don't know if the applicant has any thoughts about giving any sort of different guarantees to the board about this topic.
  215. 1:17:09Yeah, I if I could, Mr. Chair, I'd like to make a couple of comments. Um, and uh this issue of demolition of lists obviously very important to this board. You can only imagine how important it is to the members of the uh housing authority board. those board members are responsible for the safety of the people in Bliss.
  216. 1:17:28We want to get those people out of Bliss as quickly as possible and take Bliss down. Um we've had this discussion going back when a few board members raised it at almost one of the first meetings and then raised it again last week. When it was raised initially, we talked about the fact of can we seek other funding now to demolish bliss? Can we include the demolition of bliss in the first phase of the application?
  217. 1:17:52We went back the housing authority in Mount back to HUD and to ACR uh and got an answer then that um that we couldn't do that. Um uh we talked about the reason that the project is financially stressed now and to add the demolition costs of bliss would make the project infeasible.
  218. 1:18:14Okay. [clears throat] including it in sec including the demolition of bliss in the second phase uh where you can distribute those costs in that fashion um uh it makes it much easier for the state to fund. I can just give you an anecdotal piece of information.
  219. 1:18:29Malo recently with the housing authority in Kingston did a phase one of 120 units with the state, same funding program. And in phase two, we went in and we did a demolition of uh uh units and those demolition costs were included in the phase 2 uh financing costs for the state. So the state is used to doing things that way and where they can include um state funding um uh if appropriately they will do that.
  220. 1:18:53We went back recently in the last week because this was raised at the last board meeting press the state again can you give us a preliminary letter of commitment that if we move ahead with phase one that in fact you will have funding available for phase two. They they will not do that. It's not a surprise to us that they gave us the answer they gave us. But we wanted to sort of turn over every rock to try to see if we could uh do anything to help the situation um because we we share the concern of Douglas.
  221. 1:19:25So to respond to I want you understand uh this is not something that we put to the side. It's something we've been consistently working on because it's a legitimate issue. Um so to answer the the attorney's question that type of um a commitment and we call it an undertaking. I'm sure the attorneys can come up with some language.
  222. 1:19:48Um, the housing authority uh will be prepared to commit to submitting a phase 2 application within 24 months. And within that application, we would commit to including a line item budget for the demolition of Bliss. Okay? And we have to demonstrate to the state what the costs are. So, we will be able to do that.
  223. 1:20:05And just so that people understand, it's not something we could do tomorrow because in order to submit that application, we have to go through the planning process to see what is what is the rest of the phase going to look like. We know it's going to include the demolition, but one of the comments uh that I think the chair of the person made, which is a good one, is that in the planning for the next phase, the planning board can get involved earlier in the design uh and and it's going to involve a lot of open space and other issues. So, we're prepared to do that.
  224. 1:20:42We think 24 months is a reasonable time period. We might do it before then, but we certainly can't do it right now until we're under underway with phase uh uh phase one. And the state honestly wouldn't look at that application until you were far enough along in phase one that they saw the project was going up. But the housing authority prepared to make that commitment and we'd be happy to do that.
  225. 1:21:05What makes 24 months a reasonable amount of time?
  226. 1:21:08Pardon me. What makes 24 months a reasonable amount of time? What are you expecting to have happen?
  227. 1:21:12I I Well, what I'm expecting to happen is we have to uh design the project. Okay. Then we have to come back to the planning board. How long have we been before the planning board on this project? Okay. 8 months, 9 months. It's going to take 8 months to design, another 8 months, 16 months. You know, you want to make it 20 months. We can live with 20 months. 24 months is just a reasonable time. And we think that's a comfortable amount of time to design to I'm missing something to uh come back to we have to come back. we can't submit the application like unless we have the site plan not approved but but unless we have a full site plan for the project and um and uh and so the the only consideration is your ability to develop a a full site plan set of plans for phase two that well that with with the planning boards employed and submitting to the state for funding in 24 months so we come back to you guys you'll have different ideas that the chairman spoken could take nine months, it could take a week. You know, I thought it might have been give some parameters here.
  228. 1:22:22Yeah.
  229. 1:22:23I'm just trying to imagine what's happened in that time. If there I thought if there was maybe an expectation that B1 and A1 phase one would be complete in they'll be in construction during the they'll be in construction and far in far enough along that the state is going to see that we're able to deliver on on phase one. They're not going to fund phase two unless they see phase one is gone.
  230. 1:22:46It sounds to me like we have an agreement between the applicant and the attorney that we would make this a condition for um application. If there's no disagreement with that, then we accept that acceptable stop building, right? office closure. Okay, get there first.
  231. 1:23:05[clears throat]
  232. 1:23:06Um, and just I appre sorry I appreciate council's cander there's been an exchange of emails department first trying to get through this issue. Uh, we have come to the conclusion that you did. So I appreciate you with respect to bond or funding. So we appreciate your cander in that. I do agree with your analysis. Uh if the board has any concerns, you know, your city code does have a separate provision that requires insurance to be posted at the time uh any demolition permit [clears throat] is requested. So they'll be sure to post it at that time in the form of insurance.
  233. 1:23:49Thank you for that. Thank you. Um so uh we've heard from our counselors, from our adviserss, allow us hear from each other. uh we can start our discussion around the deliberation. Um Veronica, since you are off site, could I call on you to start so that you have an opportunity to express yourself?
  234. 1:24:13Um I don't I don't have anything to say at this moment.
  235. 1:24:17Okay. Well, we'll keep an eye out for you in case you do. [laughter] Speak up. Speak up if you have things you want to say.
  236. 1:24:23I will. Thank you. you who would like to initiate deliberation conversations.
  237. 1:24:34The floor is yours. Um, I guess I had one question for you, Andrew, which is like, um, were there any other I know we we talked a bit about this this issue with as well, and I think that I'm I'm feeling good about where we ended up given the constraints. Um, I think it' be ideal if we could all get the funding and like figure out some other way of doing this. like this is the sort of best best thing that we've been able to figure out. So I think thank you for your diligence.
  238. 1:25:10You're welcome. If there was a question in there, uh if there was any other um this is all engineering um draft conditions if you had any other ones that were a couple month from you?
  239. 1:25:23No, not uh Rich really covered all the conditions. only ones just the demolition and you know if the board has any conditions that they're thinking of any other uh features that need to be mitigated through this development feel free to bring them to the floor I think did you have a question I I I just had a comment I should have made this earlier I apologize but um putting aside that issue number 13 I just want um to state for the record we've looked at the other conditions the other conditions are acceptable obviously they've got to be translated in writing your attorney and we the city engineer will work with us on the final word but conceptually uh we don't have any objections to the other uh uh conditions that the engineer suggested.
  240. 1:26:10Well, I have questions about I guess to continue on this the topic of the bond and the demolition. Um and part of this is just my inability to comprehend some of this stuff and how it happens. Um if it's phase there's no guarantee that phase two will ever happen. So we could approve phase one even with this financial arrangement and phase two will never happen and it just it goes away. Is that a that's a possibility?
  241. 1:26:31Yes. In less words there's a potential phase two never comes before this board. Now that I think what the board is trying to remedy through that 24-month uh condition is to know whether that will happen cuz as we talked about before the secret determination a lot based on that demolition this board put a lot of weight into that. So if it is determined that phase 2 is not happening then the board would I think at that time have to reopen seeker and have to look in some additional mitigation measures then and whether that be a demolition bond or completing demolition by some certain date then then it could be more appropriately considered.
  242. 1:27:20The real issue that is that demolition is not part of the phase one application and the concern is that the board would try to regulate matters in excess of of its authority now and outside the scope of this application where just generally the plane board may not impose conditions that are not reasonably designed to mitigate some demonstrable in defect from an application. So what from the application before the board is the condition mitigating or remedy? I hope that answered your question. That was kind of a long answer.
  243. 1:28:04Yeah, I I mean I think I have um sort of a simple brain. Um and uh I'm struggling to understand um yeah how that works exactly. I mean, it seems to me I'm sort of amazed that we can be put in a position to approve something that a multi-phase project with no guarantees for a secondary phase. And this mechanism, I'm trying to understand this mechanism to protect ourselves from a phase that never happens. How does that work exactly?
  244. 1:28:35Well, I think the mechanism is at that 24 month period, if not sooner, the applicant is going to come back in, represent the status of this phase 2 application, and then the board would have to take some sort of action to reopen its seeker analysis, and then decide what does this board need to do to mitigate any impacts of this existing building because this phase one could be constructed then, right? So you would have to seek oh 24 months. So you'd have to seek to enforce it against the current property owner and operator you would work with them and impose the any mitigation measure on them.
  245. 1:29:13Yeah. And the building will remain owned by the housing authority as far as I understand it and it'll still be subject to all the normal city code safety regulations. So it can't it can't merely fall into dereliction or anything like that. There are still the normal code enforcement mechanisms available to the city.
  246. 1:29:41Well, presumably the housing authority would be responsible for the cost of of uh basic maintenance, utilities, insurance. Um, so that we're so I I would say that they're motivated probably to not have those extra burdens.
  247. 1:29:57Mr. General, yeah, if I could add one thing and again, I understand the concern about this. The housing authority certainly does. I I can tell you this. Um, MCO has used just about every federal and state affordable housing program over the last 20 years. We built thousands of units and um and I can tell you my professional opinion uh is that um moving ahead with this phase one is the most effective way to get list demolishment. It's the most effective way.
  248. 1:30:31There are no specific demolition grants that are out there. We'll keep looking, but there are. Okay. And the best way to get the state to phase two to fund this is to move ahead with financial planning. That's that's I would just offer that as um so if we as we talk about this from my perspective there's not a person in this room who has any substantive interest in seeing bliss remain standing right.
  249. 1:31:08Isn't I don't know this but I actually know nothing about the development fin structure but I'm under the impression that Malco is actually in like a long-term financial commitment here decades of to sort of recoup whatever yeah so I imagine owning and operating a building next to a derith building full of drain is not in your building comes down the happier we live there right never mind that you probably can't make it pencil out without additional units so you're you're sort of posed if you if list doesn't come down.
  250. 1:31:32So, I'm not trying to advocate within your party, but I just as we talk about this, it's like the idea that that there, you know, if there's a universe where bliss doesn't come down, to me, it's like only imaginable in a and maybe yet another global economic catastrophe that we're all sort of reeling from. Um, you know, rather than like some sort of development seasons. And even even so I guess my question here is um if we reopen seeker you know so our protection is that we could potentially you know if nothing happens we could pull the rug out from under the project so to speak by reopening seeker finding a determination that's that's consequential to the I think it could be pulling the rug out from under the project the materials the materials would that would likely be a substantial change for the board. I know there was a lot of discussion about that before, but there was a lot of uh reliance on the representations that would be demolished, right?
  251. 1:32:43So then you could reopen seeker process. So we we reopened seeker and then found that there was an adverse uh impact for then you would have to put it to the you'd have to look into mitigation measures, put it to the applicant, see how they can mitigate that. Alternatively, the board would prepare or the applicant would prepare an environmental impact statement listing out how that would be mitigated. And that's where you could get into the the demolition plan.
  252. 1:33:08And I should also point out once this phase 2 application comes around, this demolition bond that we're talking about could definitely be a valid condition of approval because that would be expressly before the board. And that is a very we see that frequently where that's more of the case where there's a demolition contained within the application for the board then you can have bonding requirements for the performance.
  253. 1:33:38Right I mean it I do feel like I have to point out that like we would probably just end up in a situation would is this correct that like we would be talking about a remediation of I don't know planting trees around it or something you know I mean like it just feels like and I'm just like wondering like what what would actually be reasonable for the board to even do in that tail risk like yes it's very tail risk scenario where everyone's interests are not able to be achieved yeah I'm like do we does the CO get cold if there's I guess I'm sort of asking the same question a different way of like as like that would be yeah well that that is one of the potential options hopefully.
  254. 1:34:20I think I think the public and the board want to know that that that that you know want to not just be going on trust and to know that there's a structure that um that ensures that demolition will happen and so I'm like if the board actually is in possession of pardon my casual language but like the the nuclear option of like well you actually people can inhabit this building unless you've met these unless you satisfy this requirement you know then the board could move forward knowing that we are not saddling you know that we're not running a a high risk of doing what nobody in the room wants, which is to allow a ntory collapsing building full of asbestous to sit there, right?
  255. 1:34:58One thing also, there is value under powers. Yeah, exactly. I think we're all looking in the sky there, but the large piece of property downtown Hudson that's being uh upgraded by phase one and everything else good going in this town. So eventually the process there's value here. there's probably enough value to demo the building if you didn't want to do anything or you want to do something else.
  256. 1:35:21So, I think we're looking at this and certainly I have interest right now getting phase one approved, but I think we're looking at this two too tight with each other, two together. I mean, I think just talking about all this, all we're going to do is get stuck where we are. We need phase one to get done. We need to get into construction. We'll make the application in 24 months. It's owned by the housing authority. You got value in the land and it's all good. It is. It's all good. It's not. You got to get it going. Yeah. Just really I hear the concern.
  257. 1:35:58I mean I actually I understand why the city why why residents are skeptical about this project. You know hear you say that and think why would we trust a big developer? But I've had to agree that I don't understand why any like why what sort of tail risk we're actually like it's it's so deeply not in anyone's interest to leave bliss standing. It's like it's not in the state's interest. It's not in the property owner's interest. It's not in the developer's interest. It just seems like we're it's not in the city's interest. It's not, you know, I think the the likelihood that that would happen is something that we if we have we have some sort of tailin protections, then I I don't know how much we want to the labor or or make it seem like this is a realistic thing that could happen.
  258. 1:36:43I mean, it is a condition that's been put on supplementally to the process. It wasn't a condition. I know. I'm just saying, but you're characterizing it as if it's just sort of such an obvious thing and it's not actually a risk when it wasn't actually included in the initial conversation. We've gone out of our way to come to risk for the condition. Right. So it is it is a little extraordinary. We had to go out of our way to protect ourselves in this situation is what sort of boards do their do their work. Yeah.
  259. 1:37:13Yeah. I don't think it's I don't think we've extended ourselves by by doing what we Okay. And maybe I'm missing something that our lawyer has made a recommendation of a solution. Our applicant has agreed to it. Sounds like all we need to do is say we agree. So, uh, I'd be happy to ask for a straw poll. Are we comfortable adding this dimension to the conditions?
  260. 1:37:40Yes. Yes. Yeah.
  261. 1:37:42Okay. Good. Thank you, John. And do you have something, John? Not yet. You look like you're ready to say it out a bit. There you go.
  262. 1:37:53uh other uh deliberations. I think it's actually working better that rather than round robin that we're kind of having a back and forth. know if this feels comfortably big or um well I mean this may have already been addressed but any it seems like the city of Hudson itself I mean is there any possibility like increased population over let's say the next five 10 years could have any sort of impacts I mean this may have already been answered in the you know in the document but has that um made any sort of um like provisions for that like increasing population density, how would that actually affect the site plan? I just want to make sure that I personally fully understand that.
  263. 1:38:40I just want to speak on that because we lost 80% of black people in this city. So no, it was more effective and actually bring our people back.
  264. 1:38:44So yeah, any other comments for our deliberation? Jean Sarah, this is the part of this whole process where we get to tell each other what we think and maybe advocate for how we want to advocate.
  265. 1:39:03True.
  266. 1:39:07Um I think this project is a good project. I think it improves the neighborhood. I think it improves the lives of of um all of the residents of Bliss Towers. I think that the majority of the residents of that part of Second Street uh are residents of Bliss Towers.
  267. 1:39:28Um I think that the I think there's been a number of you know um neighborly concerns raised around you know for example I think the one I found most compelling was you know once I learned more about the subs soil uh geotechnical process or the you know learned how in how construction construction vibration management works in New York City. I felt pretty alleviated by um I think it's urgent and timely.
  268. 1:40:04I think it's basically a generational lift that the city has been working towards ever since Bliss Towers, you know, was known to be structurally compromised what two decades after it was built. And by the mid 80s, we knew that as bestus was toxic. there's been decades worth of deferred maintenance because every time you open up a wall, you're in a sort of cancerous, you know, risk exposure. Um, I think that that we, you know, I understand people's aesthetic concerns and desires and I also think that this is actually going to be a a pretty beautiful building and a decent place to live and a functional community in.
  269. 1:40:46Um, I would love to talk more. I mean I there's uh been a lot said about human scale um you know the idea that that this community will not have dignity because 60 households are sharing a door um or a primary entrance and I just don't I don't as somebody with a you know PhD in gy that focused on the history of American cities um I I especially including the history of of urban renewal I don't that doesn't bear out. For me, it doesn't match my my training or my understanding or my experience of, you know, many hundreds of doorman buildings in New York City where people treat their neighbors with with dignity and compassion even though they share a large scale dwelling space.
  270. 1:41:38And I think that sometimes the tamber of discussion around this development is I mean unmistakably laden with um you know stereotypes that people might have about workingclass people or public housing. Um and um but really like the state of public housing in America is is one of a profound you know decades worth of organized abandonment. And I see this as a project that is um attempting to repair those harms of the organized abandonment of the project of public and subsidized affordable housing.
  271. 1:42:09On the subject to repair the harms, a lot of uh lip service has been pinned to that section on page 51 of the comprehensive plan that that the project must repair the harms of urban renewal. And and that's actually not what it says. It says it means to repair the harms of subsequent waves of community displacement events that have taken place in this town. It references the makin people who lived here in the beginning. It references the original displacement of neighborhoods in uh in in the late60s with the demolition of the North Bay and the waterfront. And it references the subsequent current crisis of displacement that we're enduring because of the gentrification that's occurred here in the last 20 years. and you know accelerating much more since co I think that this project meaningfully attempts to intervene in a in a profound community displacement event and um is is fitting with the neighborhood and what the town needs
  272. 1:43:13other uh deliberative comments
  273. 1:43:25yeah I mean I love the you know I share so much of what you've just shared I have the same feelings. Um, I think there's a lot about this project that is good. I love all of my neighbors at Blitz. I want nothing but best for anybody and everybody in Hudson. Um, I, you know, where we disagree is on the interpretation of that language and the and what repair constitutes and what it means to So, you you could let me finish.
  274. 1:43:48I didn't say anything. Peter, please continue.
  275. 1:43:50Okay. So the language in the plan says that um that it commits the city to promote equitable development that repairs harms and prevents displacement. Right? In the same paragraph, it talks about the harms as having been lost homes and communities of residents. My interest is in making this project better. And when I look at the design, what I see is not uh a repair of lost communities, right? I see a repeat of the institutional scale development of Blissw Islands. It is Bliss Towers laid on its side.
  276. 1:44:21You referenced 60 units going through one lobby. It's 102 units in one lobby, right? It's a 360 ft building which is wildly out of scale. That has serious social implications for residents who are otherred by living in a building that is so out of scale with everything around it. Please let me finish.
  277. 1:44:41I didn't speak Peter. Please me speaking.
  278. 1:44:44I just want to be sensitive to to the conversation. And this is not an easy thing to talk about and to do in front of a lot of people. I'm just trying to be sincere about my what I'm trying to advocate for. Um, and what I and so what's significant about this development is that there's absolutely no investment in any ground floor activity. There's a two over 200 ft of dead zone. Um there are ways to design at the ground floor on the street level that increase social interaction that increase social connection that increase community that increase community opportunities and they are not in this design right and and I consider the lack of that investment in social connection at the ground floor and and social interaction at the street level to be a disinvestment in social connection with the community and more of a repetition the same design choices at bliss 120 units at nine stories with one institutional lobby for for security.
  279. 1:45:42Design choices at the ground floor that isolate all the residents from the community. Cut them off from the whole grid. Cut them off from all the neighbors. Right. And there are design choices made at the ground floor here in this development. 102 units going through one lobby for security purposes and over 200 ft of dead zone on the street. No mixed use, no shops, no entries on the on the ground floor. These are all design choices that are less social, less community-minded than they could be. Right?
  280. 1:46:05And so what I'm saying is that there were opportunities for the developer to invest in social connection, to invest in community belonging at the street and they chose not to. And so we have a massive isolated institutional scale development that's being hailed as repair, but it's not. It's not because it's not social. It's institutional and it isolates the residents from the rest of the community. And so I mean I think the condition could be that's why I was so particular about that language. The language that they put in that document describes the architect himself said bliss towers is a good example of bad urbanism. Right?
  281. 1:46:48There's no I don't think this is good urbanism and I think there's a difference between us actually doing repair and putting conditions that make them design this into something that's more human scale inspires relationships amongst the residents and the community that would make it actually closer to real repair and not you know I feel like we're not actually having a conversation about what the building actually is. We're so busy sort of defending sides. This is I mean I feel like I've stated my case, you know, [clears throat] it's not as good as it could be and I think our neighbors at Bliss deserve the best and I think we have an opportunity as the planning board to put cons on the design of the building that's better and it's just not as good as it needs to be for the residents or for the city.
  282. 1:47:37And so I would put forward that there are a need for conditions to change the configuration to match the replies that they gave in May to make it more human scale to avoid even the appearance of looking like design choices that happened in Bliss Towers. You know what I mean? It is the dimensions. It's just a change in dimensions, the scale and the the security protocol. It's all the same. Was a repetition of bliss towers at horizontal scale. And that's my opinion. I'd like to be an umb
  283. 1:48:10this discussion has been thorough. I think the board understands your point clearly. You've articulated well and I I believe this might be the point that the board will either agree with you or not. So if you want to frame that in the form of a condition let's see if [clears throat] the board will agree with you.
  284. 1:48:29Can I just say one sort of I agree on what Sarah was saying but also some not all but some aspects of what Peter said um in that I think that um this is a very good project that is like clearly better. I don't have quite the same level of um agitation about some aspects of it that I know you do theater. Um, so I think this is like actually a quite good project. Um, that does represents Warren Street. I mean it actually does I think because it has a whole bunch of of bumpouts and um if you look at a bunch of the buildings on Warren Street, they actually have similar architectural aspect. They really do. I know. But that's the offensive part. Wait, let finish. Yeah. Yeah.
  285. 1:49:17And so I I think that like ignoring that or like is is like does a disservice to much work that the architecture did do to try and like reference this community. And um at the same time um I do share your concern about the retail on the first floor. I think that was like a fa or or um commercial space that could have been a daycare could have been something else that brings that integrates the building into the rest of the community. I think that would have been better. I think it's unfortunate that it didn't work out, but that happened for cost reasons. It's my understanding.
  286. 1:49:48Um, I also think that we have an application before us that is a good application from uh a property owner who would like to build something in their property. And that is sort of our our job is to sort of judge that to work with the applicant as we have done to make it as good as we can. And then and then you know, improve it or not with reasonable conditions. That's I I think the job we've done actually an extraordinary job working the outcome on this project and then it it has gotten better like through that process.
  287. 1:50:28Thank you, Nathan. Uh I turn to Peter.
  288. 1:50:32Um are you suggesting that we consider your u vision as a condition of the project? Yeah, absolutely.
  289. 1:50:40Okay. So, we can take a straw poll. We've discussed it. We don't need to discuss it further. Anyone want to support Peter's recommendation? Mr. Chairman, hold on. Before we put it to Hold on. Hold on. Um, anybody want to support this?
  290. 1:50:55Anybody? I I'm not clear on what you're what exactly the I think we're asking for like an informal vote, a straw poll on whether or not the board would develop a condition of approval that satisfies Peter's I mean that essentially asked for a redesign of the building including more like ground floor retail or I mean but it's not clear because it could be add more ADA compliant entrances and elevators to create smaller.
  291. 1:51:21Can I ask Andrew for clarification would that be effectively denying site plan approval? that like the more Well, I don't think we're doing formal vote on anything.
  292. 1:51:29Yeah, but like if we were to do something like that, aren't we too far along in the process for such a big ask? I'm kind of confused.
  293. 1:51:40Yeah.
  294. 1:51:42To send them back to the to the actual literal drawing board two years into I think the applicant has you've issued your name deck. It's as of right. The variances that were required were obtained. This should do that debt. You can't make the applicant go back and redesign.
  295. 1:52:03I'm ask this is also and I it does sound like the admin saying essentially this is the application and I don't think they're going to change respectfully and I think if I could just add I I think we began to have a little bit of this discussion um at the last board meeting and I I think one of the last thing I said again respectfully is the applicant isn't prepared to go back and redesign this right a lot of the issues that Peter raised rethought about. Okay. A lot of the issues that he raised can also be addressed probably better in phase two in terms of particularly commercial states.
  296. 1:52:36Uh but but putting that aside, the housing authority has to decide what it's doing. It's made a decision and again we talked about this before. The application that you have before you is in our judgment the best balance of all of the goals we're trying to do. We're trying to help the people of Bliss. We're trying to add more affordable housing. We're trying to provide open space. We're trying to provide parking and and and traffic congestion. All of those things have to be balanced within a a project that actually can be funded.
  297. 1:53:14Let me let me explain my my method. Uh this has been something that Peter has been passionate about meeting after meeting after meeting. We've heard your arguments. You articulated them clearly. You articulated them well. and you deserve to know whether or not the board supports you. I raised it to ask the board for their vote because my confidence is pretty high that the answer is going to be no.
  298. 1:53:34Now, so all of the extra discussion you've had, I just thought that Peter deserved to know that uh we don't share that particular objective. It's not that we don't want to, but we're just not going to because of where we are in the process. So I'd ask again, does anyone want to vote in favor of supporting a condition that is described as Peter has pursued it?
  299. 1:54:01Seeing none, then we're moving on to our next discussion.
  300. 1:54:04I'd also like to clear something up. Is it within our authority to to make a request? I'm saying not even now, just so much, you know, at the second meeting. I mean, is that even something we can really have control over?
  301. 1:54:20Well, yes and no. um you can't exactly make the applicant resign the project. It these discussions can come up early in the planning phase.
  302. 1:54:36Was it Veronica? Was there another part of that question?
  303. 1:54:39I just if we're taking out the timing component, is that something we could have done?
  304. 1:54:47Well, the board's not really the planning board's not really in the design business. the planning board used applications submitted to it. It gets to opine on certain elements given credence to this 325358 section where it lays out what the board is supposed to be considering and I think a lot of the discussion here has been in under the guise of comprehensive plan which is within the planning board's perview but for maybe board's benefit.
  305. 1:55:12I should point out that conformance with the comprehensive flange is one of eight conditions where no one is controlling. So it's appropriate to give consideration to all the factors not not just the comprehensive plan without diminishing any of that nice discussion and very thorough analysis from everyone.
  306. 1:55:34So I have been acting as chair and I would like to participate as a board member. Uh the comprehensive plan has come up a lot during our discussions and I really didn't understand the legal status of the plan. So I asked the city attorney to describe what is the legal status of the comprehensive plan. It is an aspirational document. Uh it is designed to inform future zoning and it has no power at all. So a lot of this discussion probably would have benefited from that knowledge earlier on.
  307. 1:56:07I I want to sh I ruminate a lot about this and I think about a lot of these issues from all kinds of points of view and and I generally agree with the direction that the board is going in terms of but there really two there are two main topics here. One is a home for our neighbors and the other is a piece of architecture that significantly participates in the fabric of our community and in some ways really defines uh largely the fabric of our community.
  308. 1:56:39And so what I would like to do is sort of set aside the housing issue. I agree with it 100%. I think we want a place of dignity, of health, of safety, of joy for any resident that that would be involved in living there in the future. Um, so I just kind of want to take you through my thinking process. So just forgive me if it rambles on a bit.
  309. 1:57:03So I spent 30 years in u the architectural world uh working with architects, planners and urban planners and landscape architects and developers, mayors, education leaders of creating design for cities, neighborhoods, schools, waterfronts and affordable housing uh communities. So I've come away from that with two powerful perspectives.
  310. 1:57:28One is I believe deeply in the power of design to transform communities and to improve the quality of life and it's sort of one of my central uh uh beliefs is that design matters and we should care deeply about uh the fabric that we create in our communities and our neighborhoods. I also have a pretty strong perspective on good urban design.
  311. 1:57:52So, I'm accustomed to when we talk about design, I'm accustomed to it being a creative process where there's give and take and back and forth. That's not how the uh the planning board works. And this is not a creative process. Uh in fact, it's pretty dry and procedural as you all probably noticed from tonight's conversation. No one is seeming to be too entertained. Um um and ultimately, it gives the planning board little leeway.
  312. 1:58:24Um, you know, either the applicant satisfies the requirement of the state through Seager and through our vote, the city uh uh requirements through our vote or it doesn't. And there's not a lot of there's not a lot of guessing on that. It's not nuanced. Uh it's complicated.
  313. 1:58:44It's technical. We have a lot of information we gather. We rely on experts. But this is not a planning shack. This is not a design workshop. And it took me a while to really begin to understand what the true function of the planning board is.
  314. 1:58:59Planning work, our work is about infrastructure, wastewater, brownfields, traffic, storm water, environmental impacts. This is essential work. It's not exciting, but it's necessary to create a a project that satisfies fundamental techn technological issues and creates a safe livable place for its resident.
  315. 1:59:26But what we do is not about discussing design excellence. The zoning code does give us architectural an architectural role and it is to do with compatibility but frankly the compatibility bar is set pretty low. Um and it does not city of Hudson does not have a written commitment to design excellence.
  316. 1:59:50And by the way part of my comments are going to be pointing out some of the weaknesses in the way we govern ourselves. And we need to think about that as a community because as I said before design excellence uh elevates uh life. It inspires people. It gives worth. It gives value. It gives dignity. Um compatibility is not the same thing as architectural excellence.
  317. 2:00:12And it's not whether this is the design I would have chosen. It's that this is the design that was presented for us to decide on. And as [clears throat] has been expressed in previous meetings by John and others, it's kind of time to vote it up or down.
  318. 2:00:27Compatibility is complicated in this particular situation because in the 50s7s excuse me the uh civic leaders at the time changed the nature of the environment around uh Bliss Tower and created a a challenge around what are we trying to be compatible with exactly where where do we compare ourselves? Well, I think HHA wisely looked to Hudson more broadly. Um, rather than saying we want to be compatible with the people across the street, we're going to step back and look at Hudson at large and see how do we design a compatibility result that fits with Hudson. This is their view.
  319. 2:01:10This is what they present. So they recognized unlike Bliss Tower which is could be anywhere USA made it was built with materials that don't belong here but the scale was out of scale. It doesn't address the street. There's so many things about Bliss Tower that are being addressed and whether or not they're addressed in a way that makes us happy is sort of beside the point because that's not what we're asked to do. We're not asked make happy. Where sitting show us how you demonstrate the u the fact that this is architecturally compatible.
  320. 2:01:46So where is the uh project compatible? Um they've taken a ninetory building and reduced it to a four or five story building. That's a little tall. Most of our downtown buildings are two and three stories but but it's arguably more of a lowrise than less power. Absolutely right. And it is more low-rise in the sense of what we're used to in Hudson.
  321. 2:02:10Uh instead of using the blonde bricks of Blisser, we're looking at um materials that are warmer uh that match the masonary and the brick of that's common stone that's common. And so is that exactly what I would want? Maybe not. But but I see what they're doing. I see I understand this is their effort to reach a compatibility uh place.
  322. 2:02:35Um, how else are they addressing that ability? U, the buildings address the street more directly. Well, this is a tower in the fields. These buildings actually are lining the street. Are they too close to the curb? Are they too far from the curve? There are kinds of little details that we could argue, but we have to say, but that was an effort to be compatible with architecture in Hudson.
  323. 2:02:59Um much of the parking is behind the building B and that's a kind of a new urbanist uh uh design. We're not putting a parking lot out front like you would in a suburban solution. So it is an urban design solution when you when you put the parking in behind the buildings instead of displaying it in front of the building. It it does create an opportunity in phase two to really address in a more creative and direct way the whole idea of how we activate the street because there's not a parking lot there to get in the way of being able to do that.
  324. 2:03:32So I think it's an idea that we can explore in phase 2. How do we address some of the activation issues that we had talked about in the last meeting? Also, activating the first floor is a concern that we would love to explore with you in phase two as that's a more than just a compatibility issue.
  325. 2:03:55Um, so I think these were meaningful design distinctions and we re I'm saying I recognize the effort. Whether I agree with this the solution is outside of my role as a planning board member. I have to say when they say we have designed a building that's compatible with the community then the zoning laws they've satisfied the zoning requirements and the city guidelines.
  326. 2:04:26Now I'm going to say again the zoning laws aren't equal to design excellence but it's a but they've satisfied and addressed those issues where the proposal falls short. I don't mean to articulate that, but we could all come up with ways that it might be better. But again, it's not our it's not our role to say, well, we like real bricks instead of, you know, brick pieces. Um, for example, so my central struggle is this.
  327. 2:04:57I am not going to stand in the way of safe, dignified housing for Bliss residents. But at the same time, I don't want to leave Hudson with a development that falls short of its potential to contribute to our urban uh fabric. Both of these matters concern me and I believe both matters are part of our obligation and responsibility to the residents, to the community at large.
  328. 2:05:24So I think that that's the process I've gone through to get to the place where I understand that the planning board is not a design chet. Planning board is not an architectural review board. We have a set of rules that we have to follow and I believe that we've followed them adequately and in some ways I think we have surpassed the minimum requirements for us to do the job that we've been asked to do. Um but I [clears throat] also want us to think about as a community how do we protect and preserve uh the uniqueness of this city?
  329. 2:05:48How do we uh frame discussions as a community that really elevate discussions about uh design and the role that design can play in expressing not only that we care and are passionate about the quality of the lives of citizens but how it expresses who we are as a people and so I have misgivings about this about this phase one but I think the need to create a dignified safe place for Hudson residents uh is a significant obligation that this board faces and we can sort out some of these other issues I hope as we move into phase two and I hope it isn't 24 months.
  330. 2:06:29I would love it if it was a year. So, if I rambled a bit too much, I apologize, but these are just some things I wanted to get off my chest.
  331. 2:06:45Sarah, any comments about my I'm looking for a little public re I've gone through the same question and I've tried to hold back like um you know there's been questions about my independence for example I'm participating in this but even as a commissioner of the housing authority you have to be independent your job is to protect residents of bliss and provide independent oversight to the staff at housing authority so but having never had a chance to weigh in on this design.
  332. 2:07:10I think if I if I had a endless money and could design, you know, whatever I thought was best. I think what's tricky here is that the applicant is legally bound to re to re to build 135 units at least before they can do anything about the crisis that people are living through in Bliss and the best way to do that is on the land they already own. Um, you know, it makes sense.
  333. 2:07:39I I mean I there's so many, you know, that the the comprehensive plan says we want to repair these barns and we want to also build more affordable housing across the city and not concentrate, but this one applicant is just happens to own this one piece of land that's developable here and it's not on the applicant to to sort of resolve all of the affordable housing needs the city of Hudson has across the city. Um, I'm not sure that I'm adding too much to what you said, Ron, but I think this this kind of question of we can sort of pit about what the design what we wish the design were, but ultimately there's a an acceptable design that that I agree has has gone really far to attempt, you know, the idea that it's bliss on its side.
  334. 2:08:20Bliss has no ground floor residences. Is that right? Yeah. There's nobody lives on the ground floor. The idea that the sidewalk is dead, those are people's homes through windows on the ground floor. Look, you know, people can tap on the window and acknowledge their neighbor as they walk by. That's not a dead zone. That's that's urban life. That's, you know, street level, um, you know, which is very different from Bliss and and the fact that, you know, Bliss is set back and this is a, you know, an active sidewalk.
  335. 2:08:48And then the idea that it's isolated, it's going to build what I what I remember is perhaps the second largest park in Hudson upon completion. I'm not sure if that statistic is right. is going to build a very large green space that people will cut through and people will holler at each other. And the idea that the design will otherize the neighbors, design, I I thoroughly believe that although design can play a role, design doesn't otherize neighbors. Neighbors otherize neighbors. And and so, you know, this is this building is such a correction or what's being proposed is such a correction to what is there. I have no problem with with sort of fullthroatedly saying let's get this underway.
  336. 2:09:31So any other comments regular deliberation? [clears throat] Could I just ask does anyone on the board have any uh comment any comments or thoughts about any of those prior conditions consider 12 months instead of 24 months?
  337. 2:09:51No, I'm not agreeing.
  338. 2:09:54I wasn't suggesting. I was just saying I move it soon.
  339. 2:09:57Did anyone have any concerns at site plan regarding the the condition? Sorry, we have ability right to shorten the time frame. Yeah.
  340. 2:10:08But I don't think we want to create a condition where we have an artificially short clock. You know, we're like in a recession. Also like the whole point is to allow the project enough time to get started such that they can start on like actually submit to us phase two. Like I don't think it's actually reasonable like it won't it won't h like a year's they won't actually start this project. I mean I won't you know dictate your business to you but like it's going to take a long while with you you're saying home community renewal get the funding like going to issue like this has been asked and answered yeah we we agreed to it and and I don't see what benefit initial distinction would be all I was saying as personal expression was I hope it's not changing or amending the the condition I do have a potential condition which I think the applicant has actually already agreed to but doesn't appear in the plans which is we have a a tree species list for street trees um I don't think it's specified in the landscape plans currently um it seems like it would be a good thing to keep tree tree species list from conservation advisory council so is that just for my benefit is that condition that the trees shown on the landscaping plan will be consistent with which boards uh the conservation advisory council to the city of Hudson has a list of approved street trees that they've vetted as being native and good as street good urban trees and a tree trying to build consistent tree is there general agreement with and it's a expansive list there's there's dozens of species on there.
  341. 2:12:03Small agreement agreement. Okay.
  342. 2:12:03Um there's one other small matter I'd like to raise and that's because a recent project has had some controversy regarding their rooftop HVAC units and I'm not sure whether we have clarified in any of this process uh where the HA units will be and how they will be shel seeded u and I don't know how to train that in the way of a of a engineering condition but so the site plan doesn't show anything specifically in the ground. So, it's our assumption that they're rooftop units and that the parapit is going to be high enough to hide them. Did you hear that?
  343. 2:12:46Alexand we're talking about screening the HVAC system on the roof.
  344. 2:12:55Yeah, they'll be screened roof.
  345. 2:12:58We just want to confirm that they will be on the roof. They'll be on there's going to be units on the roof and they will be screened and that the final plan is that they'll be adequately screened. I think that's where Rome was going to come.
  346. 2:13:09Yeah. Yeah. I that's a standard procedure. We have to we have to by code we have to screw you to screen all the equipment anyway.
  347. 2:13:15Okay. And how are you going to screen them? Should we expect the parapit that the parapit is high enough to cover?
  348. 2:13:22High enough to do that doesn't work. I mean um eer or something. There are different additives depending on where it is to be able they'll have to screen it. You really won't see it from the ground.
  349. 2:13:35We think they probably wouldn't want to change.
  350. 2:13:38No, it would it would be something that that we do this in the city all the time requirement such there many different ways of doing it.
  351. 2:13:46Okay. So, if you could give us a little clarification on that. I think I think Ron is putting it out that he'd like to make that a condition about the screening. Let's [clears throat] move on to the screen for both sound and then Yeah, it's still screen.
  352. 2:14:02Sorry.
  353. 2:14:04So, are we ready to conclude deliberation?
  354. 2:14:08Before we do, maybe did anyone have any Did anyone have any issues with the grounds for decision put forth in your code here? The maybe I'll read it again. Just stop me if anyone has any issues.
  355. 2:14:22uh the maximum safety of pedestrian and vehicular traffic access and egress site weighin which would have no no significant adverse impact on any adjoining or nearby properties by impairing the established character or the potential use of properties in the district. I have one potential thing on that the town houses.
  356. 2:14:47Um we are the applicant is going to create a parking lot that like basically goes right up to I think it's 32 North Second Street behind the town houses. That's just like one potential. I just wanted to raise for discussion like what is currently community garden that's that that is a defunct community garden defunct community garden but it will become parking lot right next to their pro the edge of their building um that's the only I just wanted to like raise this particular I don't actually know that I have a a feeling here but I think it it would be worth discussing I think as a board before we decide what to do I don't actually know what to do I happen to speak with that property owner who she's here.
  357. 2:15:31Well, I didn't want to call her, but and I'm not going to, but but but the words were I'm sorry.
  358. 2:15:38I think the property owner is comfortable with the plan. Now we are protect, you know, we have to that, you know, people sell houses and we got to think of a long-term plan, but um and I would encourage that property owner to speak up if she wanted to, but um but yeah, I I think I think it's also like I imagine this would play to what Nicole said earlier about, you know, in the prior application like if we block someone's view or if we are meaningfully obstructing your their existing use or something. I I think those are the kinds of concerns. I it's just like I think I I'd want us to have like a good discussion about rather than just walting over just for the completeness of the job at hand.
  359. 2:16:20Sounds like we we have to figure out how that operationalize what you're asking. Are you wanting to have a discussion tonight?
  360. 2:16:25I think exactly the thing this what Sarah and I just said. Yeah. Well, and again, it's it's there's the long-term character and then there's this particular property owner who's who's completely fine to have to have a parking lot between, you know, closer to our building than the new buildings themselves and have a property parking lot. So, closer to property is improvement.
  361. 2:16:45Again, this is just one factor of seven that you're looking at. And that if I understand this discussion correctly, it's limited to one specific. There's only one property that's that one and then I'm going to call it again the old church building. Those are the only two that I think would fit with that. Yeah.
  362. 2:17:11Any further discussion on that? Okay.
  363. 2:17:14uh the reasonable screening at all seasons of the year of all playgrounds, parking and service areas from view of adjacent residential properties. So I think that ties into what you were just discussing nothing else. We'll move on and it ties into the landscape plan that's included correct and the tree condition.
  364. 2:17:35So uh conformance of the proposed site development plan with the city of Hudson comprehensive plan. I think we had a substantial discussion about that in applicable cases a drainage system and layout which would afford the best solution to any drainage problem. We have our SWIP submitted again and then they're managing their own storm water run and that acceptance will be there's a condition of approval of acceptance by the land board engineer.
  365. 2:18:07[clears throat] All water bodies, wetlands, slopes and other areas of scenic, ecological and historical value shall be preserved in so far as possible. Landscape treatment should be provided to enhance architectural features, strengthen vistas and visual corridors and provide shade. Uh, no mir no material or equipment other than as shown on the approved plan shall be stored in the open. I think we touched on that one.
  366. 2:18:36In the HVAC that would be on on the roof sufficiently screened and without restricting the permissible limits of the applicable zoning district. The height, location, design and signage of each building shall be compatible with its site and the existing and historic character of the surrounding neighborhood. Just putting it on the record, those are the express factors of consideration for the board in the site development approval.
  367. 2:19:07Questions?
  368. 2:19:09Uh, one other footnote question. the materials they showed us in the last meeting, are those built into the conditions of those buildings?
  369. 2:19:16Yes. So, in our comment uh memo, we requested um we gave them two options. Either give us the building elevations with the materials incorporated, the schedule incorporated, and make it part of the site plan set or separately provide the architectural plans with a planning board approval stamp on them. So then it's all part of the approved document so they don't get lost someplace. They get actually signed in a part of an approved set.
  370. 2:19:43Yeah. Are we ready to conclude the deliberations? Yes. We ready to conclude deliberations? [clears throat]
  371. 2:19:51You're good on my end so far as there's no questions from the board. So we move into concluding discussions. Then I have a question for you Andrew. Are there any issues um that you need additional information, clarification or direction from the board before you uh start preparing the revised precluded resolution and conditions?
  372. 2:20:07Now, I think the board discussed every condition it wanted to see and then we heard some new ones tonight that were apparently accepted and part of this. I think yeah, I have two additional conditions. So, the trees and the the screening are very tough.
  373. 2:20:23So we want to take all these conditions, put it in a formal document that would be considered by this board for an action on one way or the other and we have to post that compliance with open meetings as well so the board can properly uh consider proposed resolution. So um at this point Andrew I'm going to ask you to prepare the and circulate the revised proposed um resolution and findings and conditions. Um, are and and are are you prepared for the board to vote tonight on this or would you like to have a few days to put this together?
  374. 2:21:03This is what I let me rephrase this.
  375. 2:21:04This is what I would propose. I would be interested in your reaction and the boards. So, can we give Andrew a few days to put together the final documents that we'll be asked to sign on? Okay. distribute the documents to us. So, we'll have a few days to review them and then we convene a meeting on um October 26, Monday, October 26 to [clears throat] uh review, finalize uh and decide on the application.
  376. 2:21:31Octo that we can discuss.
  377. 2:21:34I couldn't be here till 7 Monday.
  378. 2:21:39I I would believe this to be a short meeting. We have no further deliberation. I don't think we have any further question. If I understand it correctly, you the board would just be appearing to consider a motion for approval or denial second then take a vote one way or the other. So Senate would be fine for that reason. That works for everybody else.
  379. 2:22:05Well, okay. Is it possible to vote tonight? I mean, is it I mean, I know we have we we have like to sort of finalize the legal language of these conditions, but do we have enough information to make a vote and then I mean we would then just kind of Yeah.
  380. 2:22:20And it feels like it then because we're then voting on the thing that is not like vote to Well, the thing is substantively here.
  381. 2:22:32So, it would just be I mean I I understand what Ron's made made it seem like it was possible. I wasn't sure. Okay.
  382. 2:22:38Yes, it's for you, Andrew. I guess it's May I uh may I suggest October 19th next Monday?
  383. 2:22:53That would be better for me than the 26th.
  384. 2:22:56I would have uh child care issues again on the 26th, though. The 19th would work much better for me. I won't be able to be on that.
  385. 2:23:05What about during the day? I can't because I teach in Troy [clears throat] and city taken.
  386. 2:23:14Why it I don't mean to be a bear about this but is it does it happen that boards vote before the final legal articulation of the conditional because we know what the conditions are. It's not that we won't be surprised if we're just talking about articulating them in formal legal language, right?
  387. 2:23:28I think the board's substantially aware of what the conditions are. I mean, if there are any questions, please just ask. But the resolution, if the board were to take action tonight, would just be reflecting everything that's happened here and listing those conditions.
  388. 2:23:46At this point, I'm interested in protecting the record for likely uh litigation after the election, and I think voting without having the actual document in front of us would be a mistake.
  389. 2:24:05And so as chair, I really am going to argue that we need to be prudent. We need to be respectful of the schedule, which I'm being. I'm not waiting until November. Trying to do it as soon as possible. But I just don't think it's a good idea for us to rush into a final vote before the actual it in many ways, it's like the site plan package you put together. That was to protect the record. We know exactly what we're loading on now. So if the problem is not a able to find a date, let's work on that problem and fix it.
  390. 2:24:44I'm I'm so sorry because I really respect your mind here. But Andrew, is that a legally cons? Like first of all our whole community has been the sort of latigiousness with which people are operation makes sense and it's also I don't you know the the fear of a a sort of activist litigation against this project is this a like will that be a concern for litigation is that you know concern do you also recommend that we wait in order to protect ourselves from
  391. 2:25:16It would make sense for the board to consider consider the full document as fully discussed or as fully developed tonight so it knows exactly what it's voting on and I think it's properly before the public and before this board. I think there was a lot of discussion about what these conditions are. There were a lot of findings made on the record by this board and I I do think the board would benefit by seeing the resolution and reading it, considering it and I know we're all generally aware of what the conditions are, but they developed substantial since 6:00 I would think.
  392. 2:25:51So, so may I make a proposal that we take a short adjournment and we compare candidates and we not come back into session until we found a date that we can all I think this is a philosophical belief. I really want to find a date that all seven of us are here.
  393. 2:26:14Yeah. So, unless there's an objection, let's take a brief recess, stay at the table. The board is going to deliberate over a date and then we'll reconvene and put it on the record.
  394. 2:28:00I really don't want to hop ahead. You're unmuted.
  395. 2:28:04Okay. I think what makes sense, Veronica, could you tell us what dates don't work for you going forward if we're trying to do some sort of calendar elimination?
  396. 2:28:12Sure. If um I can tell you for like next week um Wednesday and Thursday would not work. Um Monday and Tuesday would be best and then the following week um hold on then I have to think about this. Um Wednesday or so the 21st I'll just do it this way easier. Um I'm sorry I'm all mixed up. the 19th and 20th or the 28th and the 29th.
  397. 2:28:47Thank you.
  398. 2:28:49So, I think we we could mute the general now. Thank you. You're welcome. game was not the play. That was not playing. He just straight up called his phone number because he Veronica, we're looking at 8:30 a.m. on the 19th of October.
  399. 2:32:20Um 8:30 a.m. on the 19th. Yeah. Yes.
  400. 2:32:28Okay. Okay. Yes.
  401. 2:32:35Um, I'll be here. I'll get on Zoom. Okay.
  402. 2:32:38Yeah. I'll make sure I'm here. And just so the board's aware, this is kind of out of the normal meeting schedule, but just make sure it's properly. Yeah. Everyone has all the more reason for it to be broadcast. Yeah. And I do think we have to keep doing this even if it's not as [clears throat] an explicit done. Any support?
  403. 2:32:58Okay. We're going to call meeting back later meet with you guys. So there's been what is the notice requirement actually?
  404. 2:33:08So it's scheduled I don't know a week ahead of time. I think you have to post it at least three days ahead. So if we just I just want to make sure we that was just updated when the report dark [laughter] would be. Yeah. 8:30 will be here. Yeah, I'll take care. Okay.
  405. 2:33:33Well, could I could I call please?
  406. 2:33:37I mean 8:30 I may not be available specifically. Could I go to Zoom? Yes, just as Veronica has today. Yeah.
  407. 2:33:44So, a motion uh is in order to schedule a special meeting um at 8:30 a.m. on October 19th. It'll be a single agenda meeting. Uh, and that would be the HHA application. Um, a motion move.
  408. 2:34:05Second second, excuse me. London child.
  409. 2:34:11Mr. Wall, yes.
  410. 2:34:12Mr. Michael, yes.
  411. 2:34:13Mr. Spear, yes.
  412. 2:34:15Mr. Shepsky, yes.
  413. 2:34:17Miss Black, yes.
  414. 2:34:18Miss Cochra, yes. Miss B. I abstain. [laughter]
  415. 2:34:27I vote. Yes. Sorry.
  416. 2:34:30Any further discussion in tonight's uh meeting of the planning board of the city of Hudson, New York?
  417. 2:34:37Rambled. I didn't eat dinner. So, draft resolution just I anticipate uh I'll send over a draft and draft be properly posted online for the board and public's review well ahead of the meeting.
  418. 2:34:55I forgot. Does that require a vote or can I just declare? Is there a motion to please second? Yes.
  419. 2:35:06Sarah around.
  420. 2:35:16Thank you. Thank you.