  1. 0:06Hello. This is the uh code and infrastructure committee meeting really only infrastructure October 15th. Um in attendance is Henry Hadad and Dan Solidor and Jason Foster. Um and Rob Perry is here to present his report for the month. Logan, are you doing the the stuff or not?
  2. 0:31Yeah.
  3. 0:34Uh, Sepage for August was $59,415. Right. Right now, we're looking at a potential surplus of about $40,000 that revenue account for the year. Uh, as I described earlier, after many years, the EC finally issued a new Speedy's permit for us. Uh the old one was from back in 2003 or four. It didn't even uh reflect the changes that we had made when we constructed a $12.5 million sewer upgrade in 2010.
  4. 1:04That has all been reconciled. Uh we have a new sampler that is there for the contact tank. So what that means is when we have an overflow event at the contact tank, the sampling unit will kick on and um you know we're going to be testing just like we do for our secondary effluent uh discharges. The um we have some new uh materials that we'll be sampling as part of this new speeies permit.
  5. 1:29Now we have to sample for mercury, ammonia, chloroform, pas uh wet chronic is actually river samples. So we have to take a sample in Ksaki to determine use that as a baseline and then we're going to sample down here and to see how our plant has uh modified the chemistry of the Hudson River.
  6. 1:55Do they someone help you with that?
  7. 1:57Uh no we have a lab company offers that because it's in everybody else's permit. It's a it's a it's a pretty much standard
  8. 2:04how we have altered it.
  9. 2:06Yes. how the city of Hudson's
  10. 2:08disturbed. Are you going to take a sample south? I mean, what's the
  11. 2:11Well, we take a sample outside of our plan. Yes. And so there's a
  12. 2:16But you go up to Kusaki, but not like
  13. 2:18that's the baseline and then we take one right below our plan at the boat club or something like that.
  14. 2:25Very clear.
  15. 2:26Yeah. Cool. Out of the 12 and a half gazillion gallons in between the two places
  16. 2:31and all the tributaries running in. Okay. It is what it is. Um the PAS just so uh you know obviously we test and have been testing for that in our water supply. It comes back non detect even uh with the state's thresholds being 500 times lower than the national threshold. Um, the reason they have to test for it is because if you have people have teflon pans
  17. 2:58in their kitchen and they wash dishes, technically the abrasion of the washing could put it in the waste water. Um, we have to test for it. I don't know what happens if you come back positive. Education, I guess, because you can't ban teflon pans.
  18. 3:15So, we've never tested for that stuff.
  19. 3:17Not in the sanitary, not in the sewer. We had tested in the drinking water for almost 10 years.
  20. 3:26So uh so uh just some maintenance stuff uh the pictures one and two are the draining of the uh secondary clarifiers and then everything hose down including the baffles which are picture two. These are the weir at at uh at three which basically the flow comes from underneath uh in between them and then it goes over those little jagged teeth.
  21. 3:50Those are the to hold back anything that's still kind of floating and then they go into those channels and go hit get hit with chlorine after that final disinfection. Um we did uh have to purchase a new secondary pump. So, you know, we have a plant that's 15 years old and uh some of the times the pumps can be repaired and sometimes they have to be replaced.
  22. 4:13So, this replacement, I believe, is about 30 or $35,000 for one pump. Yeah. So, and uh and that's not even a particularly huge pump, but that's, you know, that's why the sewer has its own its own fund. Um you know, we've we've applied for that many.
  23. 4:34No, that's I'm sorry. Um, skipping ahead. Uh, also, you know, we did we've been discussing that capital project and storm water separation. Um, back in the summer, we submitted our engineering plans to EFC, which is the bank of the DEEC. For their review, uh, their technical analysis, they did give us their responses.
  24. 4:59There was nothing crazy or out of line. It's just um things have to be addressed. Should take us a couple weeks to turn it around at that point. Has to be sent back to them. We expect them to do a another review, which shouldn't take anywhere near as long. And uh then they should authorize us to put the bid out.
  25. 5:19So, you know, we're we're hoping uh to get the bid out in November, certainly December. uh we want to get the bid on the street so that way uh we have the winter to deal with uh selecting contractors and there's a lot of work that needs to take place from the time contract is awarded until construction begins uh with a project especially when you consider that you we begin from the bottom up which is where the largest components are.
  26. 5:49So, the largest uh pipes and the largest structures have to be here first, you know, and the smaller ones are a little easier to make. You know, we won't need them until months later.
  27. 6:03They're all custom stuff.
  28. 6:04It's all custom. Yeah. Um so at the water supply grant that we applied for uh for you know transmission line these are act the pump station in cloick and you know we were hoping that we could convert them to uh VFDs variable frequency drives basically it's a acts as a brain for the pump allowing it to speed control uh but these are just soft starts they're meant to slow so the pump doesn't come on 100% immediately. But it's not going to give us what we need to actually control the the variable speed. So um
  29. 6:43so it's going to be addon or be replaced
  30. 6:47but that's part of the
  31. 6:49that's part of the grant. We'll identify and come up with alternatives and then everything that comes out of that engineering report will be used to apply for grants. That's just a kind of a sneak peek of one of the things that we know we'll uncover.
  32. 7:03Uh what else we got here? So uh Spring Street had a little bit of water recruiting for a couple of months. We did leak detection on the services for the houses, the hydrants. We couldn't find anything and everybody says there's something leaking there and we said, "Well, it's Spring Street, so maybe that's what it is. Who knows?" Um but inevitably we did excavate and you know, a lot of times a break is a massive thing that can actually wash out a road. And in this instance, uh this is about as small as it gets.
  33. 7:33this tiny bra and we put a sleeve around it and it is uh all wrapped up. So throughout our system we have about 250 hyphens about 20 that are out of service right now. The biggest issue is that for years the city uh had Mueller hidings as its standard and like most manufacturing facilities they make modifications and or improvements from from year to year, model to model.
  34. 8:04Uh the issue is that the parts for the older models are harder to come by if we can you even get them at all. So, we are um we're at a position now where we're just going to have to replace them. So, you can see in the background there's four hydrants. These are the valves. In the foreground, they have to have an isolation valve. So, you know, as opposed to having a couple hundred or $500,000 fixes for materials. It's going to be replacement. So, it'll be about $5,000 uh per
  35. 8:40So, how many have you done so far? Four.
  36. 8:42Well, we're going to we're going to do, you know, four or five. We're just going to structure it over, you know, it'll be a couple years, but you know, we'll go do the worst ones back there. Like I said, there's still there's 250 in the system, so there's still 230 that work. It's not like you there's a shortage of hydrants, but we want them to work. You know, we want them they're out there for a reason. So,
  37. 9:04and that's been said before that fire department checked in with no
  38. 9:09They don't have Yeah.
  39. 9:12Yeah. Yeah. You're right. I I remember in the past you said that there was a supply it was difficult to source them and now is it more so just budgetary constraints you don't want to throw it all out at once kind of thing.
  40. 9:24Yeah. I mean right as opposed to spending a couple thousand on materials that would fix four or five now it's 20,000 to replace four.
  41. 9:32Um but in the end it's a it's an upgraded product. They are will be new. Um the connections that are on the front of these are the new storage connection which the fire department has requested as a standard. So um you know they are upgrades in addition to you know replacing something that's that's currently out of service.
  42. 9:54Uh 150 hydrants. Uh we did some pipe cleaning over the last two months on both sections. What transmission man? Am I there yet? Ah. Uh, yeah. So, the first one is Glenwood Boulevard, although this has Genwood. So, apparently we got a new road.
  43. 10:12Um, anyway, next week the first hydrant is going to be the one uh I think it's around 75 or something like that. Glenwood. It's been out of service for a while. So, that's uh that's the first one to be switched out. I believe we're going to Fourth Street. Yeah. How big of get out the word is the city remains with us.
  44. 10:33Well, this is only going to affect the people between the valves that we isolate. So, you're talking probably 20 or 30 households potentially. Um, and these notices get dropped off at their doors. They're ready to go. They'll start dropping them off tomorrow. I believe tomorrow or Monday.
  45. 10:52Uh, let's see what we got here. Uh, pipe cleaning. So, you know, I've described it before. There's a a large pump that we sit at the creek, suck the water out, push it into the pipe, and it pushes the poly pig along. And so 10 is a a pit, receiving pit where the pig comes out. This is about five or six miles away. And you can see all the schmutzy water, the brown stuff. That's that's what those the the brillow kind of what you call it the steel brush that's around the pig scrapes off the inside of the pipe.
  46. 11:31And um so that's what we're getting out. As you can see in picture 12, you know, this water is pretty clean because we've let it go for a while. Picture 11 is how this is out in the Cloud Reservoir or the Churchtown Reservoir and there's a section of pipe. We take away uh two brackets, roll the section of pipe out, insert the pig, put the pipe back in place, put the collars around it, and pressurize it with water and send it on its way.
  47. 12:06Um so at the end of the process for the tonic line, it poly floats. So you can see in the middle of that picture floating out in the reservoir. Uh that's all clean. One of the issues that we do encounter after cleaning the church town line that comes from the reservoir to the plant is there's still cuz the pipes are drained down. Um it takes a while to get all that air out of there. And so for like a day or two after pipe cleaning, our clarifiers look like a little little champagney, a little fizzly until the water works out or until all the air works out. Um, but it doesn't, you know, adversely impact the the process. It's just uh it messes with some of the instrumentation.
  48. 12:50Uh, new stop sign, which everybody's aware of parkplace. U you know there were questions about why the stop sign's out on the road.
  49. 13:02Yes.
  50. 13:03The reason is if you look you've got the RRFB which is the flashing light that's in 2 feet uh a two foot diameter concrete base and it's 4T deep. So we can't really move that. The DOT signs are the DOT signs and the street lights there. So in order for us to move all of those would take months and a lot of money. So
  51. 13:31visibility is good.
  52. 13:32Yeah, it's out there and it finally got hit. I would have thought it would have been hit like within 3 days. So we all lost our shirts on that fact.
  53. 13:41Um but it did finally get clipped. We're thinking about putting one of those spring-loaded ones there like
  54. 13:45Oh, that's smarter.
  55. 13:46Except Except if you're around it, right? When it snaps back up. Well, it bounces up and it'll scrape the whole side of that tractor trailer.
  56. 13:55Well, tractor trail when they get the surprising this is a big deal. Surprising benefit of this is cars get out of park play season.
  57. 14:07They do.
  58. 14:08They they used to have to sit there and wait, but now that car stops and they come out.
  59. 14:13Yeah. I uh
  60. 14:14the same is kind of true on the other side of the
  61. 14:17I really the first couple days I I was like this is just terrible but personally it is much safer.
  62. 14:25It's working
  63. 14:25and it's the flow is faster.
  64. 14:28Yeah.
  65. 14:29The only people thing confusing is that two people stop signs and one's coming up and down
  66. 14:35and the reason it's not there is because they'll load up and cross the tracks and
  67. 14:39Yeah. Right. Maybe we can if we have room one day we put one of those signs that says keep moving or what do what do you put
  68. 14:47through traffic or
  69. 14:49move sucker?
  70. 14:50It's not a regular
  71. 14:51traffic does not stop.
  72. 14:52Yeah.
  73. 14:52It's not a reg one place where train can't stop.
  74. 14:56So well you you kind of the same thing over with a new one on seventh.
  75. 15:02Yeah. in Columbia because people coming down Columbia actually now have the right of way even if they're taking a left.
  76. 15:09Just a little educational we'll remember eventually.
  77. 15:14Somebody will catch up to it on somewhere.
  78. 15:19Um just one of the other signs that was requested was a little children play sign over by Lake Street. Uh unlike the ones that we did around the Fed Creek Park, you know, this was pretty simple. It's just the one sign on the ground. We don't need to do any special treatment. Um there was the questions about attaching the free speech sign to the stop sign and you know obviously yes this is a freedom of speech in the United States but it doesn't mean you can mount to a stop sign. The only thing that can be mounted to a stop sign is anything that
  79. 15:57uh accentuate like if you had like the all red bar on it or if you wanted to put all way or something like that, anything that would help clarify the the traffic control portion of it um or safety. But that that ain't it. as well.
  80. 16:13That brings a Did you hear from Worth Avenue, maybe Sonia or someone? Um, somebody had added signs or or advertisements, but they were really high.
  81. 16:26She was going to ask for help to get them down. I think uh Nick is on all that. He'll mention at code that he took them all down and he's notified the utility that we're taking them down because they didn't respond.
  82. 16:42Yeah.
  83. 16:42Um so we put them on notice, say if you don't like it, tell us to stop. He's taking them all down and when he sees them, he'll keep taking them down and he's going to start
  84. 16:51utility.
  85. 16:52Yeah. They're because they're on private property.
  86. 16:54Yeah, it's Verizon or an advertisement.
  87. 16:59Yep. I think that one is the yellow one.
  88. 17:01Probably Simmons junk removal or something. And he's giving warnings and then he's going to
  89. 17:06he wanted like a ladder in a truck. I said, "How about a shovel and just a shovel?" I mean, they're just they're just cardboard.
  90. 17:12Uh but they're on there with a washer and a big, you know, T-25 screw. And they're pretty substantial size. Um, you have to get up there and really rip them down, but then they're still up there with a washer and a
  91. 17:273 in.
  92. 17:29Well, maybe National Electrify. So,
  93. 17:31yeah, that'd be better.
  94. 17:33Oh, and those uh the street lights up,
  95. 17:36huh?
  96. 17:37Scott did that street light.
  97. 17:39Good.
  98. 17:40There are two on green. I don't mind having them not there, but in front of uh the deli.
  99. 17:47Um,
  100. 17:48do they just do they set new poles? They said they polls and they're sitting next to the poles.
  101. 17:52Okay. Well, my friend, you know,
  102. 17:54um yeah,
  103. 17:57it depends on the crew.
  104. 18:00Like they replace one by the 7th of Union and that crew moved the light from the old one to the new one. They did that on uh Gary Alley as well yesterday
  105. 18:12whatever
  106. 18:13200 block
  107. 18:14I guess like they're teaching us a lesson for you know not paying them $120,000 a year from nothing.
  108. 18:26Um couple trees came down. one. We took the one down that was dead uh in the city's lot over on Fourth and State. And um this one was down in Lower State Street. There was that monstrous willow that used to hang over that came down Saturday, I believe. So you just picked it up and pushed it over the guard rail and property owner can do whatever they want to with the retreat. Um so what do we got here? Uh this is something that is maybe a fun fact for some, maybe not for all. Uh there's there's things that DPW does that really have nothing to do with DPW.
  109. 19:04We just kind of like historically been involved with it. Um so like we're not really involved with the uh the auction business, but you know, we get called in to secure the building and and whatever, which is fine. Uh but we also get asked to assist the agencies HCDPA, HDC and the IDA who are all property owners and not many people realize that we shovel and mow all of those agency properties and they don't contribute a dime uh towards it and it's um something that has been happen it's happened for a while.
  110. 19:42I mean it's it's not a huge inconvenience but you know like I said we are u you know we are maintaining properties that are not city properties. All right. What we got here? Interesting. Um,
  111. 19:56we don't do that.
  112. 19:57Oh, and this was over at Oakdale. I received a call. Somebody had taken the grate out of the overflow drain and miraculously was it 24. The grates actually s numbered in the wrong order. The grate sitting off on the right side. And because that great the screen was not in front of the overflow pipe, it got filled up with sticks and stuff and and it clogged and started building up. So
  113. 20:26So someone took it off because they probably thought they were good doing hand.
  114. 20:30I don't know. Or they didn't want to clean it. It's easier to clean a screen when it's not.
  115. 20:34Yeah.
  116. 20:35You know, whatever. So anyway, well, let me take care of that bad boy. And you know over a paddic place there's a pretty big ravine that's um in between paddock and join place and during heavy rains that fills up. It can fill up with a lot of water 12 15 ft we probably estimate.
  117. 20:57Um, all half of that water, more than half of it comes from our neighbors in Greenport with uh Klein Street and Arthur AB and all the stuff around behind the Aldi's and McDonald's makes its way over into that ravine. Uh, there is a discharge pipe at the bottom of it that goes under the houses on the paddic and goes into the ravine on the other side that runs along the school property. So, we had to build a road to get down there to try and uh clean that out. And uh so anyway,
  118. 21:30it'll still kind of fill, but not
  119. 21:32who know. I mean, we want to get as best as we can, but we can't. It's a it's an old metal corrugated pipe. It's like a 24in pipe that's probably been in it that the the boulevards were built in the 1920s and 30s. So, I'm going to imagine the pipe is exactly that old. And metal pipes don't usually last 100 years.
  120. 21:53Well, we're just trying to clean out as much as we can so that way it doesn't impound for days at a time or a week at a time. We've actually used the pump to buy to actually take it out of there and put it in a basin and run it across the street that way. Uh, what else we got here?
  121. 22:15Investigate. Oh, this is just a kind of like when the sink holes are, you know, pop on the street. I mean, sometimes they're the city's infrastructure and sometimes they're the the lateral from the homeowner. Um, what we do is we do the preliminary investigation. And this one, you can see that we actually had to remove a section of pipe so we could get down to find the source.
  122. 22:38And the source was found to be in picture 27. This is a lateral from somebody's house. And you can see the concrete is all washed away from the side of it. Till at that point, we would inform the property owner, turn it over to them. They hire a contractor.
  123. 22:54But, you know, about $4,000 worth of work is already complete.
  124. 23:02Because we, you know, but we'd rather identify it visually than just go knock on the door, tell them to do it, and then all of a sudden we're paying a bill for a contractor. Um,
  125. 23:14so um just kind of cuz it's still is kind of out there about this rainstorm from July 29th. Uh this picture here 28 this uh this dude is on 8th Street and he's standing on the sidewalk.
  126. 23:32And so that's how much water you get 9 in in a 24hour period. It's it's called a flood. And we whatever system in the world you've got, it's not going to withstand that amount of uh when uh there's a boat coming down the road with uh two of every animal. And uh I guess the fire department said they about 40 or 50 houses with pots.
  127. 24:04Well, they don't do psy, but just complaints of water in the basement.
  128. 24:08Yeah, I got a couple inches. I could tell it was backing up from the combined sewer.
  129. 24:14But it disappeared pretty quickly, too. I'm
  130. 24:17ref.
  131. 24:19I finally got my water under control. I didn't even I had like a drop very much or the last one rather. That one's bad.
  132. 24:26Well, I rain I have water 24 hours a day going through my basement. High ground water comes through the Billco door, the bottom step and it's real. Um, I know we haven't talked about Ferry Street Bridge in a very long time, uh, because it's it's done. Um, but now, you know, over the last year, the treasur and I have been, you know, working on getting our reimbursements in place.
  133. 24:51And so, we received $3 million, um, 3.2 million or something like that back in June. And, um, there was a local share for construction was about 2 and a half million. And so, we submitted that to DOT last month. And uh we're supposed to receive that money in December.
  134. 25:10Okay. First, please see you.
  135. 25:16Yeah. So, DOT has a requirement for this high strength concrete and it's notorious for getting for for cracking. It's not structural. It's just it's cosmetic. But um you know this that's the spec that they require and it's it's not I I don't know why um when you could just use a regular 4,000 PS you know the regular mix that we use on our sidewalks.
  136. 25:46We don't run into those issues. It's a wetter mix. You know this stuff is a little drier and I guess the way it cures
  137. 25:58it cracks. So, can you go back?
  138. 26:01But you're not going to fall through. I guarantee it.
  139. 26:07I I got about five years. So,
  140. 26:09the two and a half million you just mentioned earlier. I thought you were talking about chips money, but
  141. 26:16this is say 200.
  142. 26:18But how's that? You don't get two and a half million. So,
  143. 26:21yeah, we're going to get two and a half million.
  144. 26:23But that's not normal. You're getting more than
  145. 26:27it's that reimbursement, right? Yeah. Well, the state tournament money is only to the cities in New York State. It's not chips goes to everybody. Cities, counties, towns, villages.
  146. 26:39We don't usually get 2 and a2 million. How are you able to get 2 and a half million?
  147. 26:41Oh, two and a half million is how much we spent.
  148. 26:43Oh, okay. So, you're going to
  149. 26:45we're getting reimbured. We had a local share. Yeah.
  150. 26:48There was we had a a federal highway project and that had stip money, state transportation improvement money. And so that all came from region 8 and DOT, but we only have like $3.5 million because we originally projected this stuff back in 2016 and 17. And so over the next eight years and COVID prices went up and our local share went up.
  151. 27:13So, but we had the state touring room money that we knew could be used towards our to as a reimbursement. So when the day is done, you know,
  152. 27:24I I guess that's what I'm asking. What's the update now? Is is our our annual stator touring contributing towards the two and a half million and we keep going or where's like what's the end?
  153. 27:37We the city bonded money to pay for this thing. We bonded about $5 million or $6 million. five and a half million. 600 was a a general fund. They created capital fund back in 2014. They created the capital fund and then we borrowed about $5.5 million.
  154. 28:013 million of it was skip money. We received that reimbursement in June. That left us with a balance of $2 and a half million dollars which in August we submitted to DOT under state touring route
  155. 28:15because that was eligible expense.
  156. 28:17So
  157. 28:18So we're nearly done that this will this will
  158. 28:21Yeah, there's the only thing that's outstanding is the engineer has uh you know come in with a a final change order request to close out their contract. Um but at this stage of the game, you know, they need to it's reimburseable, but the money has to be moved around in some of the stip accounts
  159. 28:40because there are balances and and what do given us enough to cover, you know, what their their outstanding expenses are. But until those are moved by DOT, then we can't reimburse it. And so until that's done, I I haven't submitted it to you for your consideration because I'm not going to do that until I can Well, I'm not going to put it in front of you until I can state absolutely 100% certainty that it's 100% reimburseable.
  160. 29:11Okay.
  161. 29:11Well, the the bridge I think was a huge success. I think it's great.
  162. 29:16The ski slope.
  163. 29:18Um and uh uh your gift to me last year was to amend these two codes me as a flood plane administrator.
  164. 29:30Yeah. So, uh, I'll be attending a flood plane insurance program conference in Ariskany next month.
  165. 29:38That central New York.
  166. 29:40Yeah.
  167. 29:42The way you
  168. 29:44can I ask uh a big question. Um, the flooding at Second End Street. Um, I know it's during heavy events. it. When I look at it, I see that it's lower than say the dog park and but higher than the wetlands beyond the dog park. And now the governor is announcing grants and grant opportunities apply for things to address flooding. In your opinion, is it worth pursuing or is it feasible at all to drain that intersection to the wetlands?
  169. 30:29Well, that's where it does go.
  170. 30:31And it's you think is it is it just the rising river gets so high that these elevations don't matter? Is it small pipes? It's just that you've got those basins that are all along that second street that area all tie into discharge pipes that go into the North Bay.
  171. 30:52Yeah.
  172. 30:53But when it's overwhelmed, I mean, it's only like a 36 inch diameter pipe. Well, I say only, I mean, that's a pretty goddamn big pipe. But when you get, you know, four, five, 7, 10 inches of rain, that that pipe is going to be overwhelmed. And
  173. 31:12but I mean, let's say, you know, when we Is that intersection underwater during these torrential rains? It is, but I drove through it every single time and I duranged out. So, it's not like it's, you know, you're not bringing scuba gear out.
  174. 31:28Yeah. Um, but yes, it is underwater, which means that all of our infrastructure is underwater. Um, but it's so so pass every time it's happened, it's been passable.
  175. 31:40Otherwise, I wouldn't have been able to take the pictures from the other side,
  176. 31:44right? And it usually dissipates in a day.
  177. 31:48No, as soon as the rain stops, this a matter of hours.
  178. 31:51Yeah, it doesn't take that long.
  179. 31:53Yeah.
  180. 31:53Okay. That discharge in the bay is on the other side of the dock park. So you want like three?
  181. 31:59No, it's on the other side of craft tech.
  182. 32:01Oh, so
  183. 32:02it goes through their parking lot.
  184. 32:04How far do you think that is? A couple hundred feet.
  185. 32:06Couple hundred feet.
  186. 32:09I guess that's Yeah. So by the time it gets there, it's going to be pretty low.
  187. 32:15Yeah. There's not a whole lot of pitch on that plate.
  188. 32:19Okay.
  189. 32:20Um, anyone else have a question? a whole another thing. But um I Diana is here. Uh Diana sent an email. Would you like to talk or
  190. 32:31Sure. Um yeah, I was thinking about um I've been wondering since the plantings happened down on Front Street near Warren. There was like a big state like when we redid the sidewalks and there were like all these plantings and stuff like that that happened in 2025.
  191. 32:52Yeah. D
  192. 32:56project.
  193. 32:57Yeah, I think so.
  194. 32:58Yeah, it is. What am I asking?
  195. 33:00I don't know if they I don't know which things were like new cutouts in the sidewalk or old things that were built in. But in any case, there was like a whole landscaping project that happened down on Front Street. And when it was put in, I saw it being put in and it was like a huge it was like a heat wave. It was like a million degrees and it was just like oh no. And anybody who saw it was just like these plants are never going to survive. So like a year went by the tip of summer actually some of the plants did survive and some of the plants are doing great and others of those plants are not doing great. And I started to look at those and then I started walking up systematically up front street and then I noticed that like some of the spaces actually were never planted with new plants at all. So like you know something where it's like clearly there are like plants and new trees and like individual things with like flowers and stuff like that or alongside things that are just green grass that nothing really has done. And I'm just wondering in my mind I would expect that as a group all of these things would be planted with plants and also that we would be monitoring and making sure that those plants are actually doing well. Um I have two questions. One is does anybody know can anybody speak to whether those were all supposed to be planted but some of them somehow weren't or like why we ended up with this
  196. 34:24mismatch. No, the answer is no.
  197. 34:26Okay. They were intentionally some were intentionally lawn and some were intentionally plantings.
  198. 34:32Okay. So that was like
  199. 34:34that's not a mistake that you know whoever kind of designed that entire thing that was all over. Okay.
  200. 34:40Yes.
  201. 34:40And then the second thing is the worst looking one is the biggest most central one which is if you're walking down Warren Street and the you know the prominade and the stairs are in front of you. Literally walking down the middle of the street, you get to Front Street, right in front of you, on the far side of the street, like on the river side of the street is a big planting cutout. And it's like the plants look like this. Like it's like the saddest looking thing. Like a few of them are growing here and then the rest of them are like
  202. 35:13Is that on the left side or the right side?
  203. 35:17It's uh What do you mean the left side?
  204. 35:19Well, if you're down at Warren Street, you're facing across the street. Is it on the right side of the entrance to the park or on the left side of the entrance to the park?
  205. 35:26It's right at the street. So, if I if the river is here and I'm coming down Warren, it's right in front of me in the center and with like the two, you know, like ramps that go like this. So, it's just one central thing that's right at the intersection with the river beyond it. It's not
  206. 35:44Is this on the sidewalk or in the park itself?
  207. 35:46It's at the sidewalk like you know, right a couple inches. Cuz all I know is if you're looking at talking about the section that's to the left of center then a car drove over that this past year.
  208. 35:58No, no, it's that was still I was actually there on site when that happened. So I know exactly what you're talking about. Okay.
  209. 36:04No, like that was cuz there are two benches that are to the sides of it. It's
  210. 36:08there's only one bench now,
  211. 36:10right? The the bench is gone. It's the middle thing. Actually, if you have it if anybody has it on their laptop and can bring you I don't know. But in any case, I did like an attachment to my email which like shows this like incredibly sad and kind of like
  212. 36:24it's to the right. Looks like it's to the right of the entrance when you're looking at it.
  213. 36:28Okay.
  214. 36:29That's what I I glean that from your picture. It does look sad.
  215. 36:32Yeah. And it's the most central thing. I mean, it's like that everybody like kind of coming down Warren Street in the summer is just looking at this like very metered and overlooked thing that's the center point of the whole intersection. So, I just was wondering like what's the deal with that and like what can we do to like get somebody to take a look at it and figure out what needs to happen so that we can have plants that actually are properly, you know, growing.
  216. 36:59All it takes is money. You know, that was that was part of a project. That project is we've made the final payment to the contractor. everything is closed out per the contract documents and um you know we're seeking final reimbursement for the last half a million dollars or something like that but going forward I mean it's within the city right away. So uh you want to put money in a city budget line item and you can plant whatever whatever anybody wants to plant there.
  217. 37:29Okay.
  218. 37:30But it's not for me to decide. What would Well, I wanted to ask it since you're the person who kind of like, you know, oversees the team who maintains them. So, I thought you would have knowledge of it, but like where the plantings come like would that come through the conservation people or like
  219. 37:46we don't really have anybody. I think the closest thing you can do whatever you can put as a line item in a parks budget. Yeah. I mean,
  220. 37:52well, we have then we have to put money in a resolution uh a line item for DPW, but we would have to find an agency to do the uh I guess you could call it gardening.
  221. 38:07Uhhuh.
  222. 38:08Flower bed tending.
  223. 38:09Yeah.
  224. 38:11It was everything that they put in was supposed to be, you know, low maintenance.
  225. 38:15We did citizens adopt such an error.
  226. 38:17Sure. We did have some people that came to a meeting asking what they could do to volunteer and make, this is like four or five months ago, the the budget a little less constrained. And that would be a a good place to start a a what do you call it? A flower box maintenance group.
  227. 38:38We already have seven different volunteer organizations, right? We have friends of Hudson Youth, friends of public square, friends of friends of friends of so anybody's we already, you know,
  228. 38:50you can raise money, you can volunteer time or effort or
  229. 38:54I I think the care and maintenance would be better in that regard. I think we could get it planted, but it's just the nature of someone who plants it and maintains it and cares for it is always going to be more thorough. Maybe see see about um maybe people residents or business want to sponsor a flower box or something.
  230. 39:18Yeah, we don't have to pay for it. You can get someone to attend to it.
  231. 39:22If you could start a concept, we can continue this conversation.
  232. 39:26Yeah. Well, like what what would it vision be? I mean, all I'm expecting is that it would be that the plantings because some of the plants are doing fine. So whoever selected the plans, you know, and made that decision,
  233. 39:40it's the wrong plan
  234. 39:41like did that mostly fine, but one area is like not driving. It's not my specialty to like be like here's what like I'm the last person to do that.
  235. 39:53Not my specialty either.
  236. 39:55I might have someone in mind to ask a question of
  237. 39:59Yeah. But if you at least conceptualize what you would see there, that would be helpful as since it's been your concern.
  238. 40:06If you could kind of write it a note of
  239. 40:09I don't know another step of what you would see there.
  240. 40:13Did you have to send this email to me?
  241. 40:15No, I sent it just to the committee. Well, if you if you can find the time to send it to me, I can reach out to Brit cuz we have Brit uh as there's $5,000 in the account in parks as a contracting consultant and so she works with us on our tree pruning and stuff like that, but if I don't know about it, I can't act on it.
  242. 40:37Yeah.
  243. 40:37So, make sure you somebody can forward it to.
  244. 40:40Yeah, sure.
  245. 40:41Okay.
  246. 40:41Easy.
  247. 40:44Okay. Any questions here?
  248. 40:48Nope.
  249. 40:52Whatever.
  250. 40:53Bill, would you like to ask a question?
  251. 40:56Yeah. Can you hear me?
  252. 40:58We can hear you now.
  253. 41:00Great. Um, well, uh, I just I just have to point out um that the person that just went ahead of me spoke for at least four minutes, I would say, and had more than one question. Um,
  254. 41:11she's I'd like to Yeah, that's funny. Uh, Mr. Perry. Hey, make some more fat jokes about me.
  255. 41:17Excuse me. It's my time, Mr. Perry.
  256. 41:20Says who?
  257. 41:21That Oh, says who? Shut up. You
  258. 41:25Come on, stop crying. Ask a question.
  259. 41:26I'd like to bring up an issue that I I see as a problem with uh this committee. And you you can refute me if you'd like. It seems to me that issues are brought to to the attention of this committee and you, Jason, and you, Henry, and they are forgotten about. I'd like to bring up three examples and you you can tell me where things stand.
  260. 41:43Um, and I was going to bring up first the issue of uh the Ferry Street Bridge, but Mr. Perry brought that up. I'd like to get to that third if I could. First of all, uh, Jason, as you you I I hope that you recall, you brought to Mr. Perry's attention, the fact that you got an email or some sort of correspondence from a from somebody in town who um saw had issues with the condition of Glenwood Boulevard between the lakes.
  261. 42:12I don't know if you still call it Sixth Street or Glenn B Glenwood Boulevard. Uh and you told Mr. Perry about it and he said he would he would get his guys on it when he could. And I'm I'd like to know when that was taken care of because only one side of the street was done. that side on the Oakdale side, that side of the street on the Oakdale side has been has been patched, I would say, rather poorly, but it's been done.
  262. 42:36I guess um I'm wondering why hasn't the other side of the street where people typically walk on hasn't been taken care of? You can get to that. Secondly, Mr. Perry also brought was attention to Mr. Perry was brought by a resident about four or five months ago who was actually at the meeting in city hall who who informed Mr. Perry who was uh uh I guess not aware of the fact that uh Storm Avenue was without any overnight parking rules and that everybody was parking on either side of the street so that the street wasn't swept properly in the wintertime um uh after snowfall.
  263. 43:14And Mr. Perry said as as I recall and he should recall and as as you all should recall, Mr. Perry said that it would get taken care of with signs with parking signs installed on Storm Avenue. Now, that has not happened. Not only has it not happened, but you, Jason, and you, Henry, have not brought this issue up to Mr. Perry's attention to find out why it hasn't happened.
  264. 43:38And what I'd like I'd like I'd like I'd like answers to both of those issues, but I'd also like to ask Mr. Perry, this Rob, you have just said that you it sounds like you were expecting the Ferry Street Bridge concrete to be cracked. Is that correct?
  265. 43:55No, we're not. We don't have
  266. 43:56You weren't you weren't So, you weren't expecting You weren't expecting it to be cracked, but it is. Are you concerned that it's continuing to crack?
  267. 44:05No, you're not. And who is going to repair the cracks and the crumbling concrete once it gets to the that point?
  268. 44:14Okay. Well, it's not crumbling. It's superficial cracking. It's high
  269. 44:17superficial like your questions, Bill.
  270. 44:20Let's talk about the stop signs. Listen, the stop signs turns out that on that block of Aken Avenue, there's no houses that face it. And there was a question from the police as to we would do odd, even or certain days. And uh quite honestly, nothing ever happened because we just didn't get around to discussing it. And uh it is what it is, right? It's one block of one street and the sweeper catches areas that they can and if they can't, they go on.
  271. 44:48As far as the half of uh Glenwood, that was the half that was requested by uh the other side seems to be okay. Um but you know, we're probably going to be putting that in our paving project next year and everything will be all buttoned up nice and tidy. I think that's it.
  272. 45:09All right. Thank you very much. Uh, can I have a motion to adjurnn?
  273. 45:13Motion.
  274. 45:14Second.
  275. 45:15Second.
  276. 45:15All right. Thanks, Sharon.
  277. 45:18Thank you very much.

Timestamps link to the corresponding moment on YouTube. Auto-transcribed, contains speech-recognition errors. Not an official record.